A platform for research: civil engineering, architecture and urbanism
EVALUASI PEMELIHARAAN DAN PERAWATAN BANGUNAN GEDUNG K. H. HASJIM ASJ’ARIE, KAMPUS A, UNIVERSITAS NEGERI JAKARTA
This study aims to explain the suitability between the implementation of maintain and maintain (repair) of the building K. H. Hasjim Asj'arie, Campus A, Jakarta State University in the field with Standar Operating Procedures (SOP) and Minister of Public Works Regulation Number: 24/PRT/M/2008. The research systematic used in this study is to use the Discrepancy Evaluation Model or the gap evaluation model developed by Provus. In this research, the data collection method used is by means of observation, interviews and documentation. The results showed that for the maintenance aspect, the percentage of conformity between the Regulation of the Minister of Public Works Number: 24/PRT/M/2008 and SOP (Standar Operating Procedure) was 78% for architectural components and 48% for mechanical and electrical components, field conditions according to the Minister of Public Works Regulation Number: 24/PRT/M/2008 of 35% for architectural components and 65% for mechanical and electrical components. As for the maintenance (repair) aspect, the percentage of conformity between the Regulation of the Minister of Public Works Number: 24/PRT/M/2008 and SOP (Standar Operating Procedure) is 42%, the percentage result of conformity between field conditions and the Regulation of the Minister of Public Works Number: 24/PRT/M/2008 at 75%.
EVALUASI PEMELIHARAAN DAN PERAWATAN BANGUNAN GEDUNG K. H. HASJIM ASJ’ARIE, KAMPUS A, UNIVERSITAS NEGERI JAKARTA
This study aims to explain the suitability between the implementation of maintain and maintain (repair) of the building K. H. Hasjim Asj'arie, Campus A, Jakarta State University in the field with Standar Operating Procedures (SOP) and Minister of Public Works Regulation Number: 24/PRT/M/2008. The research systematic used in this study is to use the Discrepancy Evaluation Model or the gap evaluation model developed by Provus. In this research, the data collection method used is by means of observation, interviews and documentation. The results showed that for the maintenance aspect, the percentage of conformity between the Regulation of the Minister of Public Works Number: 24/PRT/M/2008 and SOP (Standar Operating Procedure) was 78% for architectural components and 48% for mechanical and electrical components, field conditions according to the Minister of Public Works Regulation Number: 24/PRT/M/2008 of 35% for architectural components and 65% for mechanical and electrical components. As for the maintenance (repair) aspect, the percentage of conformity between the Regulation of the Minister of Public Works Number: 24/PRT/M/2008 and SOP (Standar Operating Procedure) is 42%, the percentage result of conformity between field conditions and the Regulation of the Minister of Public Works Number: 24/PRT/M/2008 at 75%.
EVALUASI PEMELIHARAAN DAN PERAWATAN BANGUNAN GEDUNG K. H. HASJIM ASJ’ARIE, KAMPUS A, UNIVERSITAS NEGERI JAKARTA
Widianto, Fajar (author) / Lenggogeni (author) / Rahmayanti, Henita (author)
2022-01-31
doi:10.21009/jmenara.v17i1.17417
Menara: Jurnal Teknik Sipil; Vol 17 No 1 (2022): Menara : Jurnal Teknik Sipil; 35 - 42 ; 2622-5549 ; 1907-4360 ; 10.21009/jmenara.v17i1
Article (Journal)
Electronic Resource
English
building , maintenance , evaluation , repair
DDC:
720
SISTEM PENDUKUNG KEPUTUSAN ALTERNATIF PEMELIHARAAN BANGUNAN GEDUNG DI POLITEKNIK NEGERI SRIWIJAYA
BASE | 2011
|EVALUASI PENGGUNAAN LISTRIK PADA BANGUNAN GEDUNG DI LINGKUNGAN UNIVERSITAS TADULAKO
BASE | 2011
|EVALUASI PENGGUNAAN LISTRIK PADA BANGUNAN GEDUNG DI LINGKUNGAN UNIVERSITAS TADULAKO
BASE | 2012
|