A platform for research: civil engineering, architecture and urbanism
Engineering and Economic Preconditioning for Draining of the PWiK Facilities in Głogów
The facilities belonging to Przedsiębiorstwo Wodociągów i Kanalizacji (PWiK) in Głogów have been erected on the floodplain of the Odra river. In consequence, they are in a state of permanent dampness or flooded. Therefore, the need has arisen for indicating an effective method of draining the facilities. In the paper, four different methods of solving the problem have been indicated which are differentiated in both engineering and economic respects.
Engineering and Economic Preconditioning for Draining of the PWiK Facilities in Głogów
The facilities belonging to Przedsiębiorstwo Wodociągów i Kanalizacji (PWiK) in Głogów have been erected on the floodplain of the Odra river. In consequence, they are in a state of permanent dampness or flooded. Therefore, the need has arisen for indicating an effective method of draining the facilities. In the paper, four different methods of solving the problem have been indicated which are differentiated in both engineering and economic respects.
Engineering and Economic Preconditioning for Draining of the PWiK Facilities in Głogów
Kołodziejczyk Urszula (author)
2012
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Engineering and Economic Preconditioning for Draining of the PWiK Facilities in Głogów
Online Contents | 2012
|Verification of the Simulation Model Based on the Example of Combined Sewage System in Głogów
DOAJ | 2018
|