A platform for research: civil engineering, architecture and urbanism
Determination of general calculus for the absolute gass discharge of the mine, initial PDp. After finishing the mining aktivity, usable for any mine in the Ostrava-Karviná distrikt (OKD)
The forecasting of the development of gas capacity in OKR mines after termination of mining activities is solved in the submitted paper. Based on theoretical consideration there is proposed a proper calculation of absolute initial cas capacity of the mine PDP. (m3 CH4.24 hours-1).
Determination of general calculus for the absolute gass discharge of the mine, initial PDp. After finishing the mining aktivity, usable for any mine in the Ostrava-Karviná distrikt (OKD)
The forecasting of the development of gas capacity in OKR mines after termination of mining activities is solved in the submitted paper. Based on theoretical consideration there is proposed a proper calculation of absolute initial cas capacity of the mine PDP. (m3 CH4.24 hours-1).
Determination of general calculus for the absolute gass discharge of the mine, initial PDp. After finishing the mining aktivity, usable for any mine in the Ostrava-Karviná distrikt (OKD)
Dragon Vladimír (author)
2003
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Long-term development of seismic monitoring networks in the Ostrava-Karviná coal mine district
BASE | 2012
|The Analysis of the Risks of the Firedamp Leakage at the Ostrava-Karvina Mine District
DOAJ | 2012
|Influence of Mining Activity on Selected Landslide in the Ostrava-Karviná Coalfield
DOAJ | 2008
|