A platform for research: civil engineering, architecture and urbanism
A Comprehensive Investigation on Abnormal Impoundment of Reservoirs—A Case Study of Qionglin Reservoir in Kinmen Island
Leakage is the most serious problem in reservoir operation, because heavy leakage influences reservoir impoundment efficiency and even leads to a complete loss of reservoir functions. Since its completion in 1982, Qionglin Reservoir has never been fully filled with water except in the spring of 1983 when there was heavy rain. The reservoir management unit suspected that its side slopes, bottom or dam might leak and carried out a number of leakage prevention and improvement works, but all of them failed to fulfill the impoundment function of the reservoir. Hence, this study attempts to find out the reasons why the reservoir cannot impound water. A series of tests and investigations are carried out in this study, including electrical resistivity tomography of dam, tracer test, geological drilling test, reservoir water level observation, investigation of reservoir catchment area and field investigation of dam. The test results and investigation results show that no leakage path and leakage are found. According to the analysis, there is no serious leakage of this reservoir. The main reason for the failure of impoundment is that massive improper development in the catchment area influences the runoff into the reservoir.
A Comprehensive Investigation on Abnormal Impoundment of Reservoirs—A Case Study of Qionglin Reservoir in Kinmen Island
Leakage is the most serious problem in reservoir operation, because heavy leakage influences reservoir impoundment efficiency and even leads to a complete loss of reservoir functions. Since its completion in 1982, Qionglin Reservoir has never been fully filled with water except in the spring of 1983 when there was heavy rain. The reservoir management unit suspected that its side slopes, bottom or dam might leak and carried out a number of leakage prevention and improvement works, but all of them failed to fulfill the impoundment function of the reservoir. Hence, this study attempts to find out the reasons why the reservoir cannot impound water. A series of tests and investigations are carried out in this study, including electrical resistivity tomography of dam, tracer test, geological drilling test, reservoir water level observation, investigation of reservoir catchment area and field investigation of dam. The test results and investigation results show that no leakage path and leakage are found. According to the analysis, there is no serious leakage of this reservoir. The main reason for the failure of impoundment is that massive improper development in the catchment area influences the runoff into the reservoir.
A Comprehensive Investigation on Abnormal Impoundment of Reservoirs—A Case Study of Qionglin Reservoir in Kinmen Island
Yin-Chun Hung (author) / Tung-Tsan Chen (author) / Tsai-Fu Tsai (author) / Hao-Xi Chen (author)
2021
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Disinfection byproduct formation kinetics of a water treatment plant on Kinmen Island
Online Contents | 2015
|IMPOUNDMENT BIOLOGY OF WILSON RESERVOIR, KANSAS
Wiley | 1970
|Predicting change in fish mercury concentrations following reservoir impoundment
Online Contents | 1998
|Study on the concentration of nutrient in a channel reservoir after impoundment
British Library Conference Proceedings | 2011
|