A platform for research: civil engineering, architecture and urbanism
Application of Concrete Cutoff Wall to Extended Tiegang Reservoir Project
Application of Concrete Cutoff Wall to Extended Tiegang Reservoir Project
Application of Concrete Cutoff Wall to Extended Tiegang Reservoir Project
WU Shu-hong (author)
2009
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Eastside Reservoir Project, West Dam Plastic Concrete Cutoff
British Library Conference Proceedings | 1997
|Foundation cutoff wall -- Allegheny reservoir dam
Engineering Index Backfile | 1966
|Quality Control for Construction of Concrete Cutoff Wall of Dahe Reservoir
DOAJ | 2003
|Concrete cutoff wall drilled down 250 Ft
Engineering Index Backfile | 1963
|