A platform for research: civil engineering, architecture and urbanism
The Significance of Coordination for Industrialised Building System (IBS) Precast Concrete in Construction Industry
IBS precast concrete is construction system which is meant to improve the conventional construction process. However IBS precast concrete projects are suffering from serious problems such as cost overrun, delays and less quality of the end product. The absence of coordination is perceived as the reason for this issue. The purpose of this paper is to review the significance of coordination for IBS precast concrete in the construction industry. It if found that the fragmentation which occurs in the construction industry requires continuity of coordination due to the construction activities are intertwined in nature. Coordination is designated to assist stakeholders in completing and complementing each other with the paramount focus of achieving the objective. Proper coordination is required in delivering the desired construction product at the ideal time, cost and quality. As for the findings, the significance of coordination for IBS precast concrete can be seen through the precast concrete construction phases which consist of planning; design; manufacturing; transportation and installation/construction. These phases are meant to complement construction process with the purpose to reduce issues of fragmentation and enhance IBS precast concrete project delivery.
The Significance of Coordination for Industrialised Building System (IBS) Precast Concrete in Construction Industry
IBS precast concrete is construction system which is meant to improve the conventional construction process. However IBS precast concrete projects are suffering from serious problems such as cost overrun, delays and less quality of the end product. The absence of coordination is perceived as the reason for this issue. The purpose of this paper is to review the significance of coordination for IBS precast concrete in the construction industry. It if found that the fragmentation which occurs in the construction industry requires continuity of coordination due to the construction activities are intertwined in nature. Coordination is designated to assist stakeholders in completing and complementing each other with the paramount focus of achieving the objective. Proper coordination is required in delivering the desired construction product at the ideal time, cost and quality. As for the findings, the significance of coordination for IBS precast concrete can be seen through the precast concrete construction phases which consist of planning; design; manufacturing; transportation and installation/construction. These phases are meant to complement construction process with the purpose to reduce issues of fragmentation and enhance IBS precast concrete project delivery.
The Significance of Coordination for Industrialised Building System (IBS) Precast Concrete in Construction Industry
Fitri Othman Mohd Khairul (author) / Wan Muhammad Wan Mohd Nurdden (author) / Abd Hadi Nurulhudaya (author) / Azman Mohd Azrai (author)
2017
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
New Concepts in Industrialised System of Construction - Automation of Precast Concrete Production
British Library Conference Proceedings | 1994
|Springer Verlag | 2024
|Engineering Index Backfile | 1964
|European Patent Office | 2024
|Industrialised site-casted concrete
British Library Conference Proceedings | 1998
|