A platform for research: civil engineering, architecture and urbanism
Support or Risk? Software Project Risk Assessment Model Based on Rough Set Theory and Backpropagation Neural Network
Software supports continuous economic growth but has risks of uncertainty. In order to improve the risk-assessing accuracy of software project development, this paper proposes an assessment model based on the combination of backpropagation neural network (BPNN) and rough set theory (RST). First, a risk list with 35 risk factors were grouped into six risk categories via the brainstorming method and the original sample data set was constructed according to the initial risk list. Subsequently, an attribute reduction algorithm of the rough set was used to eliminate the redundancy attributes from the original sample dataset. The input factors of the software project risk assessment model could be reduced from thirty-five to twelve by the attribute reduction. Finally, the refined sample data subset was used to train the BPNN and the test sample data subset was used to verify the trained BPNN. The test results showed that the proposed joint model could achieve a better assessment than the model based only on the BPNN.
Support or Risk? Software Project Risk Assessment Model Based on Rough Set Theory and Backpropagation Neural Network
Software supports continuous economic growth but has risks of uncertainty. In order to improve the risk-assessing accuracy of software project development, this paper proposes an assessment model based on the combination of backpropagation neural network (BPNN) and rough set theory (RST). First, a risk list with 35 risk factors were grouped into six risk categories via the brainstorming method and the original sample data set was constructed according to the initial risk list. Subsequently, an attribute reduction algorithm of the rough set was used to eliminate the redundancy attributes from the original sample dataset. The input factors of the software project risk assessment model could be reduced from thirty-five to twelve by the attribute reduction. Finally, the refined sample data subset was used to train the BPNN and the test sample data subset was used to verify the trained BPNN. The test results showed that the proposed joint model could achieve a better assessment than the model based only on the BPNN.
Support or Risk? Software Project Risk Assessment Model Based on Rough Set Theory and Backpropagation Neural Network
Xiaoqing Li (author) / Qingquan Jiang (author) / Maxwell K. Hsu (author) / Qinglan Chen (author)
2019
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
A Pavement Condition Rating Model using Backpropagation Neural Network
Online Contents | 1995
|Investment Risk Assessment of Hydraulic Engineering Based on Rough Set Theory
British Library Conference Proceedings | 2014
|Assessment on Logistics Outsourcing Risk Based on Rough Set Theory and Unascertained Measure Model
British Library Online Contents | 2010
|