A platform for research: civil engineering, architecture and urbanism
Probabilistic and sensitivity analysis of Botlek Bridge structures
This paper deals with the probabilistic and sensitivity analysis of the largest movable lift bridge of the world. The bridge system consists of six reinforced concrete pylons and two steel decks 4000 tons weight each connected through ropes with counterweights. The paper focuses the probabilistic and sensitivity analysis as the base of dynamic study in design process of the bridge. The results had a high importance for practical application and design of the bridge. The model and resistance uncertainties were taken into account in LHS simulation method.
Probabilistic and sensitivity analysis of Botlek Bridge structures
This paper deals with the probabilistic and sensitivity analysis of the largest movable lift bridge of the world. The bridge system consists of six reinforced concrete pylons and two steel decks 4000 tons weight each connected through ropes with counterweights. The paper focuses the probabilistic and sensitivity analysis as the base of dynamic study in design process of the bridge. The results had a high importance for practical application and design of the bridge. The model and resistance uncertainties were taken into account in LHS simulation method.
Probabilistic and sensitivity analysis of Botlek Bridge structures
Králik Juraj (author) / Rosko Peter (author)
2017
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Engineering Index Backfile | 1963
|Replacement of Botlek Lifting Bridge, Motorway A15, Netherlands
British Library Conference Proceedings | 2013
|Voorzuivering DWP Botlek in gebruik
Online Contents | 2012
British Library Conference Proceedings | 1998
|Akzo considers bioremediation for Botlek site
Online Contents | 1997