A platform for research: civil engineering, architecture and urbanism
Technological Reliability and Efficiency of Wastewater Treatment in Two Hybrid Constructed Wetlands in the Roztocze National Park (Poland)
The paper presents the results of a 3-year study on the technological reliability and the efficiency of typical domestic wastewater treatment in two hybrid constructed wetland systems (CWs) located in the area of the Roztocze National Park (Poland). The studied objects consist of an initial settling tank and a system of two beds of the vertical flow (VF) and horizontal flow (HF) (VF–HF) type with reed and willow. The wastewater flow rate in the constructed wetlands systems (CWs) was 0.4 and 1.0 m3/d, respectively. During the study period (2017–2019) 20 series of analyses were performed and 60 wastewater samples were collected. Based on the obtained results the effects of pollutant removal and the technological reliability were determined, which were specified with the Weibull method. The average efficiency of biochemical oxygen demand (BOD5) and chemical oxygen demand (COD) removal was 96–99%. Slightly lower effects were obtained in the case of total phosphorus (TP) removal (90–94%), as well as for total suspended solids (TSS) (80–87%) and total nitrogen (TN) (73–86%) removal. The analysed CWs were characterised by 100% technological reliability for BOD5 and COD, as well as a good reliability for TSS and TP (87–100%) but slightly lower for TN removal (35–89%). Hybrid CWs of VF–HF type should be recommended to use in protected areas for wastewater treatment and water resources quality protection.
Technological Reliability and Efficiency of Wastewater Treatment in Two Hybrid Constructed Wetlands in the Roztocze National Park (Poland)
The paper presents the results of a 3-year study on the technological reliability and the efficiency of typical domestic wastewater treatment in two hybrid constructed wetland systems (CWs) located in the area of the Roztocze National Park (Poland). The studied objects consist of an initial settling tank and a system of two beds of the vertical flow (VF) and horizontal flow (HF) (VF–HF) type with reed and willow. The wastewater flow rate in the constructed wetlands systems (CWs) was 0.4 and 1.0 m3/d, respectively. During the study period (2017–2019) 20 series of analyses were performed and 60 wastewater samples were collected. Based on the obtained results the effects of pollutant removal and the technological reliability were determined, which were specified with the Weibull method. The average efficiency of biochemical oxygen demand (BOD5) and chemical oxygen demand (COD) removal was 96–99%. Slightly lower effects were obtained in the case of total phosphorus (TP) removal (90–94%), as well as for total suspended solids (TSS) (80–87%) and total nitrogen (TN) (73–86%) removal. The analysed CWs were characterised by 100% technological reliability for BOD5 and COD, as well as a good reliability for TSS and TP (87–100%) but slightly lower for TN removal (35–89%). Hybrid CWs of VF–HF type should be recommended to use in protected areas for wastewater treatment and water resources quality protection.
Technological Reliability and Efficiency of Wastewater Treatment in Two Hybrid Constructed Wetlands in the Roztocze National Park (Poland)
Agnieszka Micek (author) / Krzysztof Jóźwiakowski (author) / Michał Marzec (author) / Agnieszka Listosz (author)
2020
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Recent Developments in Wastewater Treatment in Constructed Wetlands in Poland
Springer Verlag | 2005
|Recent Developments in Wastewater Treatment in Constructed Wetlands in Poland
British Library Conference Proceedings | 2005
|Wastewater Treatment Using Constructed Wetlands
Online Contents | 2002
|