A platform for research: civil engineering, architecture and urbanism
EXPLOITATION OF GLASS SAND ON THE OPEN PIT »VRTLINSKA« (MOSLAVINA, CROATIA)
The exploitation of glass sand in Slavonia and Moslavina has a long tradition. The open-pit »Vrtlinska« is-accordirtg to its dimensions and production capacity the biggest one in this regions. Exploitation reserves within this open pit amount about) 1 000 000 t glass sand of a very good quality, and the production capacity is 200 000 t yearly according to real needs during design and opening the pit, i. e. before the war. This article discusses geological and geomechanical characteristics of the deposit, as well as the exploitation process, which is considerably matching natural characteristics of the deposit. A more detailed description is given of the planned exploitation phase I above groundwater level which is carried out according to discontinuous system. For the exploitation of the depth part under groundwater level in the phase II, the necessity of further examination of hydrogeological characteristics of the deposit is presented, in order to acquire necessary information on groundwater regime and drainage conditions. Such knowledge will influence the choice of the most appropriate solutions in the exploitation of the depth part of the deposit.
EXPLOITATION OF GLASS SAND ON THE OPEN PIT »VRTLINSKA« (MOSLAVINA, CROATIA)
The exploitation of glass sand in Slavonia and Moslavina has a long tradition. The open-pit »Vrtlinska« is-accordirtg to its dimensions and production capacity the biggest one in this regions. Exploitation reserves within this open pit amount about) 1 000 000 t glass sand of a very good quality, and the production capacity is 200 000 t yearly according to real needs during design and opening the pit, i. e. before the war. This article discusses geological and geomechanical characteristics of the deposit, as well as the exploitation process, which is considerably matching natural characteristics of the deposit. A more detailed description is given of the planned exploitation phase I above groundwater level which is carried out according to discontinuous system. For the exploitation of the depth part under groundwater level in the phase II, the necessity of further examination of hydrogeological characteristics of the deposit is presented, in order to acquire necessary information on groundwater regime and drainage conditions. Such knowledge will influence the choice of the most appropriate solutions in the exploitation of the depth part of the deposit.
EXPLOITATION OF GLASS SAND ON THE OPEN PIT »VRTLINSKA« (MOSLAVINA, CROATIA)
Slavko Vujec (author) / Borislav Perić (author)
1994
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Exploitation of Mineral Raw Material in Croatia
British Library Online Contents | 2002
|Hydraulic Limitation of Exploitation Vrana Lake for Water Supply (Croatia)
British Library Conference Proceedings | 2001
|Historical review of exploitation and utilization of stone in Croatia
British Library Conference Proceedings | 2004
|Construction and Exploitation Problems at Sveti Rok Tunnel in Croatia
British Library Conference Proceedings | 2002
|Construction and Exploitation Problems at Sveti Rok Tunnel in Croatia
British Library Conference Proceedings | 2002
|