A platform for research: civil engineering, architecture and urbanism
Numerical analysis of tailing dam with calibration based on genetic algorithm and geotechnical monitoring data
The article presents a method of calibration of material parameters of a numerical model based on a genetic algorithm, which allows to match the calculation results with measurements from the geotechnical monitoring network. This method can be used for the maintenance of objects managed by the observation method, which requires continuous monitoring and design alterations. The correctness of the calibration method has been verified on the basis of artificially generated data in order to eliminate inaccuracies related to approximations resulting from the numerical model generation. Using the example of the tailing dam model the quality of prediction of the selected measurement points was verified. Moreover, changes of factor of safety values, which is an important indicator for designing this type of construction, were analyzed. It was decided to exploit the case of dam of reservoir, which is under continuous construction, that is dam height is increasing constantly, because in this situation the use of the observation method is relevant.
Numerical analysis of tailing dam with calibration based on genetic algorithm and geotechnical monitoring data
The article presents a method of calibration of material parameters of a numerical model based on a genetic algorithm, which allows to match the calculation results with measurements from the geotechnical monitoring network. This method can be used for the maintenance of objects managed by the observation method, which requires continuous monitoring and design alterations. The correctness of the calibration method has been verified on the basis of artificially generated data in order to eliminate inaccuracies related to approximations resulting from the numerical model generation. Using the example of the tailing dam model the quality of prediction of the selected measurement points was verified. Moreover, changes of factor of safety values, which is an important indicator for designing this type of construction, were analyzed. It was decided to exploit the case of dam of reservoir, which is under continuous construction, that is dam height is increasing constantly, because in this situation the use of the observation method is relevant.
Numerical analysis of tailing dam with calibration based on genetic algorithm and geotechnical monitoring data
Grosel Szczepan (author)
2020
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Geotechnical Modelling and Numerical Analysis of the Tailing Dam Stability
Springer Verlag | 2024
|Electrical Resistivity-Based Characterization of Geotechnical Properties of Mine Tailing
Springer Verlag | 2022
|Geotechnical characterisation of zinc tailing waste material for road construction
Taylor & Francis Verlag | 2022
|Geotechnical Modelling of Optimization of Technological Parameters of the Tailing Dam Alluvium
Springer Verlag | 2019
|