A platform for research: civil engineering, architecture and urbanism
Analysis of the Remediation of Coal Tar-Contaminated Groundwater Using Ex Situ Remediation
The article describes the remediation of contaminated groundwater during the ex situ remediation of coal tar contamination following the closure of a coking plant in the Moravian–Silesian Region (Czech Republic). The aim of the article is to point out the advantages of ex situ soil remediation via the excavation of the contaminated geological environment combined with thermal desorption, a method of removing contaminants both from soil and groundwater. Its advantage is the absolute qualitative and quantitative control over the contaminated soil with the possibility of precise segmentation into contaminated and non-contaminated soils. Next, all contaminated groundwater may be pumped off upon the construction of sealing walls to control groundwater flows. To excavate the soil, it is necessary to reduce the contaminated groundwater level inside the sealing walls and thus create conditions for the extraction of contaminated soils using standard machinery. In detail, the article describes the removal of the contaminated groundwater and compares the quality of the pumped and inflowing water before and after the remediation. The locality is characteristic of a high horizontal and vertical grain-size heterogeneity of gravel-sand, which led to a varying filtration coefficient affecting the capacities of pumped groundwater quantity during the remediation. At the start of the remediation process, the contaminant levels exceeded the limits by the Czech Environmental Inspectorate several times. The post-remediation monitoring showed that all the contaminant levels were below the limit. Surprisingly, the overall groundwater contamination amounted to 232.86 t of contaminants as non-aqueous phase liquids, and 6872.9 kg of dissolved contaminants. As much as 12,200 t of contaminants were removed from the soil.
Analysis of the Remediation of Coal Tar-Contaminated Groundwater Using Ex Situ Remediation
The article describes the remediation of contaminated groundwater during the ex situ remediation of coal tar contamination following the closure of a coking plant in the Moravian–Silesian Region (Czech Republic). The aim of the article is to point out the advantages of ex situ soil remediation via the excavation of the contaminated geological environment combined with thermal desorption, a method of removing contaminants both from soil and groundwater. Its advantage is the absolute qualitative and quantitative control over the contaminated soil with the possibility of precise segmentation into contaminated and non-contaminated soils. Next, all contaminated groundwater may be pumped off upon the construction of sealing walls to control groundwater flows. To excavate the soil, it is necessary to reduce the contaminated groundwater level inside the sealing walls and thus create conditions for the extraction of contaminated soils using standard machinery. In detail, the article describes the removal of the contaminated groundwater and compares the quality of the pumped and inflowing water before and after the remediation. The locality is characteristic of a high horizontal and vertical grain-size heterogeneity of gravel-sand, which led to a varying filtration coefficient affecting the capacities of pumped groundwater quantity during the remediation. At the start of the remediation process, the contaminant levels exceeded the limits by the Czech Environmental Inspectorate several times. The post-remediation monitoring showed that all the contaminant levels were below the limit. Surprisingly, the overall groundwater contamination amounted to 232.86 t of contaminants as non-aqueous phase liquids, and 6872.9 kg of dissolved contaminants. As much as 12,200 t of contaminants were removed from the soil.
Analysis of the Remediation of Coal Tar-Contaminated Groundwater Using Ex Situ Remediation
Marian Marschalko (author) / Tomas Kempa (author) / Dariusz Popielarczyk (author) / Miroslav Cernik (author) / Michaela Vicherkova (author) / Petr Vicherek (author) / Dominik Niemiec (author)
2022
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
In-situ electrokinetic remediation of groundwater contaminated by heavy metal
British Library Conference Proceedings | 2002
|In situ remediation of nitrate-contaminated groundwater using a permeable reactive barrier
British Library Conference Proceedings | 2002
|Peroxone for remediation of TNT-contaminated groundwater
British Library Conference Proceedings | 1994
|An Enhanced Remediation Technology for Contaminated Groundwater
British Library Conference Proceedings | 2013
|Adsorption Process Selection for Contaminated Groundwater Remediation
British Library Conference Proceedings | 1992
|