A platform for research: civil engineering, architecture and urbanism
PROBLEMS IN THE TUBING/PACKER SYSTEM
When gas and oil wells are completed and produced or treated through the tubing connected to packer, there is a great number of problems to be solved. Changes in temperatures and pressures that occure during various operations ussually result in changes in tubing lengths or tubing to packer forces, depending on tubing to packer connections. This paper summarises some earlier papers and explains partly elaborated details. It also gives a complete approach to solve problems in uniform strings regardless to tubing and packer connections (the paper is published in Croatian).
PROBLEMS IN THE TUBING/PACKER SYSTEM
When gas and oil wells are completed and produced or treated through the tubing connected to packer, there is a great number of problems to be solved. Changes in temperatures and pressures that occure during various operations ussually result in changes in tubing lengths or tubing to packer forces, depending on tubing to packer connections. This paper summarises some earlier papers and explains partly elaborated details. It also gives a complete approach to solve problems in uniform strings regardless to tubing and packer connections (the paper is published in Croatian).
PROBLEMS IN THE TUBING/PACKER SYSTEM
Davorin Matanović (author) / Mario Livaja (author)
1993
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Corrosivity Analysis of Tubing-casing Environment and Optimization of Packer Fluids for Y Oilfield
British Library Online Contents | 2017
|