A platform for research: civil engineering, architecture and urbanism
Risk Control in Optimization of Cascade Hydropower: Considering Water Abandonment Risk Probability
Water abandonment risk caused by inflow uncertainties is a major problem in cascade hydropower generation operation and water resources management. In this study, we propose a theoretical estimation method (TEM) to calculate water abandonment risk probability (WARP) utilizing sample inflow data and historical forecast errors. The method analyzes the differences in risk quantification between the head hydropower station and downstream stations, and the corresponding probability formula is provided. Then, a short-term optimal operation model of cascade hydropower stations considering the additional WARP water level constraints is constructed to dynamically control water level risk. The Dahuashui (DHS)-Geliqiao (GLQ) cascade hydropower stations in the Wujiang River Basin of China is investigated as a case study. The results show that compared with the historical scheme, the total amount of water abandonment of DHS, GLQ and DHS-GLQ in the WARP optimal scheme decreases by 11.69%, 47.69% and 28.27%, respectively, and the flood peak of GLQ is reduced by 21.6%. In conclusion, compared with the traditional control approach and actual operation processes, the proposed risk control in optimization of cascade hydropower considering WARP can improve the comprehensive utilization efficiency of cascade hydropower systems by reducing the occurrence of water abandonment and thereby increase generation profits.
Risk Control in Optimization of Cascade Hydropower: Considering Water Abandonment Risk Probability
Water abandonment risk caused by inflow uncertainties is a major problem in cascade hydropower generation operation and water resources management. In this study, we propose a theoretical estimation method (TEM) to calculate water abandonment risk probability (WARP) utilizing sample inflow data and historical forecast errors. The method analyzes the differences in risk quantification between the head hydropower station and downstream stations, and the corresponding probability formula is provided. Then, a short-term optimal operation model of cascade hydropower stations considering the additional WARP water level constraints is constructed to dynamically control water level risk. The Dahuashui (DHS)-Geliqiao (GLQ) cascade hydropower stations in the Wujiang River Basin of China is investigated as a case study. The results show that compared with the historical scheme, the total amount of water abandonment of DHS, GLQ and DHS-GLQ in the WARP optimal scheme decreases by 11.69%, 47.69% and 28.27%, respectively, and the flood peak of GLQ is reduced by 21.6%. In conclusion, compared with the traditional control approach and actual operation processes, the proposed risk control in optimization of cascade hydropower considering WARP can improve the comprehensive utilization efficiency of cascade hydropower systems by reducing the occurrence of water abandonment and thereby increase generation profits.
Risk Control in Optimization of Cascade Hydropower: Considering Water Abandonment Risk Probability
Xinyi Zhang (author) / Guohua Fang (author) / Jian Ye (author) / Jin Liu (author) / Xin Wen (author) / Chengjun Wu (author)
2022
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Cost Risk Assessment for Large Hydropower Project Based on the Probability Distribution
British Library Conference Proceedings | 2012
|Backwater Effect over Tailrace Water Level in Cascade Hydropower Plants
British Library Conference Proceedings | 2013
|Analysis on Investment Risk of Hydropower Project
British Library Conference Proceedings | 2013
|ASSESSING RISK IN HYDRO PLANNING - Risk simulation methods for hydropower feasibility assessment
Online Contents | 2007
|