A platform for research: civil engineering, architecture and urbanism
A Simulation Model of Construction Projects Executed in Random Conditions with the Overlapping Construction Works
Reducing the duration of construction works requires additional organizational measures, such as selecting construction methods that assure a shorter realization time, engaging additional resources, working overtime, or allowing construction works to be performed simultaneously in the same working units. The simultaneous work of crews may affect the quality of works and the efficiency of construction processes. This article presents a simulation model aimed at assessing the impact of the overlap period on the extension of the working time of the crews and the reduction of a repetitive project’s duration in random conditions. The purpose of simulation studies is to provide construction managers with guidelines when deciding on the dates of starting the sequential technological process lines realized by specialized working crews, for sustainable scheduling and organization of construction projects.
A Simulation Model of Construction Projects Executed in Random Conditions with the Overlapping Construction Works
Reducing the duration of construction works requires additional organizational measures, such as selecting construction methods that assure a shorter realization time, engaging additional resources, working overtime, or allowing construction works to be performed simultaneously in the same working units. The simultaneous work of crews may affect the quality of works and the efficiency of construction processes. This article presents a simulation model aimed at assessing the impact of the overlap period on the extension of the working time of the crews and the reduction of a repetitive project’s duration in random conditions. The purpose of simulation studies is to provide construction managers with guidelines when deciding on the dates of starting the sequential technological process lines realized by specialized working crews, for sustainable scheduling and organization of construction projects.
A Simulation Model of Construction Projects Executed in Random Conditions with the Overlapping Construction Works
Sławomir Biruk (author) / Łukasz Rzepecki (author)
2021
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Construction: Staffing for Civil Works Projects
NTIS | 1993
Activity Overlapping Assessment in Construction, Oil, and Gas Projects
British Library Conference Proceedings | 2010
|Optimization of overlapping activities in the design phase of construction projects
British Library Online Contents | 2015
|Optimization of overlapping activities in the design phase of construction projects
British Library Online Contents | 2015
|