Cable Force Calculation of Cable Hoisting of CFST Arch Bridge Research
To effectively control the stress state and spatial alignment of arch ribs in the cable hoisting construction of a long-span, concrete-filled, steel tube arch bridge and ensure the safety of the structure, it is necessary to calculate and determine the appropriate cable force. Based on the actual project of a double-span, concrete-filled, steel tubular arch bridge, the construction stage of the left span of the bridge from the beginning of construction to the closure is taken as an example. The linear control method of “quiet do not move” is adopted. Based on the principle that the vertical displacement of the front end of the installed segment caused by the self-weight of the new hoisting segment is equal to the vertical displacement of the front end of the previous segment caused by the tension of the new hoisting segment, the tension cable force is calculated by forward iteration. Finally, based on the theory of the stress-free state method, the ideal linear design of the structure was achieved. The results show that after the closure of the bridge, the error range of the cable tension force is −13.33–15.40% on the left bank and −8.37–11.00% on the right bank. The elevation error of the arch rib is −0.003–0.043 m on the left bank and −0.007–0.032 m on the right bank. The overall stress error of the bridge arch is ±7.0 MPa. The error between the theoretical value and the actual value is within the scope of the specification requirements, which meets the specification requirements. After the closure, the arch shape of the bridge meets the smooth requirements.
Cable Force Calculation of Cable Hoisting of CFST Arch Bridge Research
To effectively control the stress state and spatial alignment of arch ribs in the cable hoisting construction of a long-span, concrete-filled, steel tube arch bridge and ensure the safety of the structure, it is necessary to calculate and determine the appropriate cable force. Based on the actual project of a double-span, concrete-filled, steel tubular arch bridge, the construction stage of the left span of the bridge from the beginning of construction to the closure is taken as an example. The linear control method of “quiet do not move” is adopted. Based on the principle that the vertical displacement of the front end of the installed segment caused by the self-weight of the new hoisting segment is equal to the vertical displacement of the front end of the previous segment caused by the tension of the new hoisting segment, the tension cable force is calculated by forward iteration. Finally, based on the theory of the stress-free state method, the ideal linear design of the structure was achieved. The results show that after the closure of the bridge, the error range of the cable tension force is −13.33–15.40% on the left bank and −8.37–11.00% on the right bank. The elevation error of the arch rib is −0.003–0.043 m on the left bank and −0.007–0.032 m on the right bank. The overall stress error of the bridge arch is ±7.0 MPa. The error between the theoretical value and the actual value is within the scope of the specification requirements, which meets the specification requirements. After the closure, the arch shape of the bridge meets the smooth requirements.
Cable Force Calculation of Cable Hoisting of CFST Arch Bridge Research
Yi Jia (author) / Chaokuan Wei (author) / Ziqiu Huang (author) / Qi Li (author) / Ping Liao (author) / Wencong Lin (author)
2023
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Arch bridge cable hoisting buckle cable arc-shaped anchor box
European Patent Office | 2020
|A Comprehensive Method of Determining Cable Force during Closure Condition for CFST Arch Bridge
British Library Conference Proceedings | 2012
|Integrated hoisting device and hoisting method for through arch bridge cable hoisting steel girder
European Patent Office | 2024
|Commonly Encountered Damages in Cable Members of CFST Arch Bridge and Detection Methods
Trans Tech Publications | 2014
|