A platform for research: civil engineering, architecture and urbanism
For a Green Stadium: Economic Feasibility of Sustainable Renewable Electricity Generation at the Jeju World Cup Venue
After the 2002 FIFA World Cup in South Korea and Japan, the local governments of South Korea were left in charge of several large-scale soccer stadiums. Although these governments have made significant efforts toward creating profits from the stadiums, it is proving to be too difficult for several administrations to cover their full operational, maintenance, and conservation costs. In order to overcome this problem, one of the governments, Seogwipo City, which owns Jeju World Cup Stadium (JWCS), is attempting to provide an independent renewable electricity generation system for the operation of the stadium. The current study therefore examines potential configurations of an independent renewable electricity generation system for JWCS, using HOMER software. The simulation results yield three optimal system configurations with a renewable fraction of 1.00 and relatively low values for the cost of energy ($0.405, $0.546, and $0.692 per kWh). Through the examination of these three possible optimal configurations, the implications and limitations of the current study are presented.
For a Green Stadium: Economic Feasibility of Sustainable Renewable Electricity Generation at the Jeju World Cup Venue
After the 2002 FIFA World Cup in South Korea and Japan, the local governments of South Korea were left in charge of several large-scale soccer stadiums. Although these governments have made significant efforts toward creating profits from the stadiums, it is proving to be too difficult for several administrations to cover their full operational, maintenance, and conservation costs. In order to overcome this problem, one of the governments, Seogwipo City, which owns Jeju World Cup Stadium (JWCS), is attempting to provide an independent renewable electricity generation system for the operation of the stadium. The current study therefore examines potential configurations of an independent renewable electricity generation system for JWCS, using HOMER software. The simulation results yield three optimal system configurations with a renewable fraction of 1.00 and relatively low values for the cost of energy ($0.405, $0.546, and $0.692 per kWh). Through the examination of these three possible optimal configurations, the implications and limitations of the current study are presented.
For a Green Stadium: Economic Feasibility of Sustainable Renewable Electricity Generation at the Jeju World Cup Venue
Eunil Park (author) / Sang Jib Kwon (author) / Angel P. del Pobil (author)
2016
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Wembley Stadium : venue of legends
TIBKAT | 2007
|The Roof Structure of the Jeju Worldcup Stadium
British Library Conference Proceedings | 2005
|The Roof Structure of the Jeju Worldcup Stadium
ASCE | 2005
|The Stadium, rock concert venue, Vitrolles, R. Ricciotti
Online Contents | 1995