A platform for research: civil engineering, architecture and urbanism
Optimum mine production rate based on price uncertainty
Abstract The production rate of a mining operation has an important effect on the operational cycle and gross profit, which are often evaluated based on engineering practices. Assessment of the economic performance of mine operations in mining engineering is of great importance because an incorrect production rate can result in significant financial losses. The production rate is composed of two bases: the cost estimation and the price scenario. Bureau of Mines studies performed on American mines indicated that processing costs can be estimated through the production rate. This article proposes to connect the model presented by the Bureau of Mines and queuing theory to describe the operational costs, which are used to develop a production optimization methodology. The proposed cost composition describes a production system to verify the law of diminishing returns and the economy of scale. Between these regions of the production curve, the optimum point was determined with mathematical precision.
Optimum mine production rate based on price uncertainty
Abstract The production rate of a mining operation has an important effect on the operational cycle and gross profit, which are often evaluated based on engineering practices. Assessment of the economic performance of mine operations in mining engineering is of great importance because an incorrect production rate can result in significant financial losses. The production rate is composed of two bases: the cost estimation and the price scenario. Bureau of Mines studies performed on American mines indicated that processing costs can be estimated through the production rate. This article proposes to connect the model presented by the Bureau of Mines and queuing theory to describe the operational costs, which are used to develop a production optimization methodology. The proposed cost composition describes a production system to verify the law of diminishing returns and the economy of scale. Between these regions of the production curve, the optimum point was determined with mathematical precision.
Optimum mine production rate based on price uncertainty
Felipe Ribeiro Souza (author) / Taís Renata Câmara (author) / Vidal Félix Navarro Torres (author) / Beck Nader (author) / Roberto Galery (author)
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Optimum firm location under factor-price uncertainty
Online Contents | 1984
|Optimum life of mine: declining production case
Online Contents | 1985
|PRICE UNCERTAINTY AND PRODUCTION-LOCATION DECISIONS UNDER FREE ENTRY OLIGOPOLY
Online Contents | 1993
|Design of optimum dip in Angouran open cast mine
British Library Conference Proceedings | 2001
|