A platform for research: civil engineering, architecture and urbanism
PBA Construction Technology for Metro Station Expanding Excavation Undercrossing Parallel Existing Structure
Objective Affected by the occupation of existing buildings (structures) on the ground, the main retaining piles in shield receiving areas at both ends of some metro stations cannot be built. Therefore, it is necessary to study the pile-beam-arch (PBA)construction technology for expanding excavation of metro station undercrossing the parallel existing buildings or structures. Method With the project of Nijiaqiao Station on New Line 18 in Chengdu Metro undercrossing the existing structures as the research object, a finite element model is established to analyze the subsidence characteristics of the land and the existing structures according to the actual construction plan, and the results are verified by on-site monitoring data. Result & Conclusion PBA construction technologies including advanced large pipe shed, temporary column support system, staggering excavation of 7guiding holes and manual excavation cast-in-place pile are used, successfully implementing the station main retaining pile construction under the premise of effectively controlling the subsidence of land and the existing buildings. The construction steps that have the greatest impact on the above-mentioned subsidence are the excavation of guiding holes 1, 3, 5, 7. The subsidence of existing structures is obvious at guiding holes 1 and 2 with the maximum value of 9.62 mm, 1.5 times the simulated value. Both the on-site monitoring results and the simulated results meet the safety control requirements.
PBA Construction Technology for Metro Station Expanding Excavation Undercrossing Parallel Existing Structure
Objective Affected by the occupation of existing buildings (structures) on the ground, the main retaining piles in shield receiving areas at both ends of some metro stations cannot be built. Therefore, it is necessary to study the pile-beam-arch (PBA)construction technology for expanding excavation of metro station undercrossing the parallel existing buildings or structures. Method With the project of Nijiaqiao Station on New Line 18 in Chengdu Metro undercrossing the existing structures as the research object, a finite element model is established to analyze the subsidence characteristics of the land and the existing structures according to the actual construction plan, and the results are verified by on-site monitoring data. Result & Conclusion PBA construction technologies including advanced large pipe shed, temporary column support system, staggering excavation of 7guiding holes and manual excavation cast-in-place pile are used, successfully implementing the station main retaining pile construction under the premise of effectively controlling the subsidence of land and the existing buildings. The construction steps that have the greatest impact on the above-mentioned subsidence are the excavation of guiding holes 1, 3, 5, 7. The subsidence of existing structures is obvious at guiding holes 1 and 2 with the maximum value of 9.62 mm, 1.5 times the simulated value. Both the on-site monitoring results and the simulated results meet the safety control requirements.
PBA Construction Technology for Metro Station Expanding Excavation Undercrossing Parallel Existing Structure
ZHENG Longchao (author) / LI Ming (author) / PAN Wu (author) / LI Jing (author) / LU Junfu (author)
2024
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Influence of undercrossing tunnel excavation on the settlement of a metro station in Dalian
Online Contents | 2021
|Structural Behaviors of Large-Section Mine Tunnels Undercrossing Existing Metro Lines
DOAJ | 2023
|Centrifuge Model Study of Impact on Existing Undercrossing Induced by Deep Excavation
British Library Conference Proceedings | 2010
|Research on Deformation Influence of Shield Undercrossing the Existing Metro Double Shield Tunnel
Trans Tech Publications | 2014
|