A platform for research: civil engineering, architecture and urbanism
Research of Coalbed Methane Development Well-Type Optimization Method Based on Unit Technical Cost
Coalbed Methane (CBM) is a high-quality unconventional energy resource. The successful development and utilization of a CBM resource needs to consider technical feasibility and economic viability. These factors are also necessary for the improvement of production safety in coal mines, reducing carbon emission, and optimizing energy structure. Because of its unique resource characteristics, surface drilling is the prevailing development approach all over the world. Directional and horizontal wells are generally the two major well-types for CBM development. Development well-type is an important factor affecting CBM efficient development, as it is a key factor in the process of the economic and effective development of CBM resource. In this paper, a method based on Unit Technical Cost (UTC) will be constructed from the perspective of economic viability, and will be used for more simple and accurate optimization of CBM. This method is used for practical well-type optimization in two major CBM development basins in China, and the application results prove that this method is scientifically accurate and feasible.
Research of Coalbed Methane Development Well-Type Optimization Method Based on Unit Technical Cost
Coalbed Methane (CBM) is a high-quality unconventional energy resource. The successful development and utilization of a CBM resource needs to consider technical feasibility and economic viability. These factors are also necessary for the improvement of production safety in coal mines, reducing carbon emission, and optimizing energy structure. Because of its unique resource characteristics, surface drilling is the prevailing development approach all over the world. Directional and horizontal wells are generally the two major well-types for CBM development. Development well-type is an important factor affecting CBM efficient development, as it is a key factor in the process of the economic and effective development of CBM resource. In this paper, a method based on Unit Technical Cost (UTC) will be constructed from the perspective of economic viability, and will be used for more simple and accurate optimization of CBM. This method is used for practical well-type optimization in two major CBM development basins in China, and the application results prove that this method is scientifically accurate and feasible.
Research of Coalbed Methane Development Well-Type Optimization Method Based on Unit Technical Cost
Shiqun Li (author) / Baosheng Zhang (author)
2016
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Research on Numerical Simulation of Coalbed Methane Well
British Library Online Contents | 2000
|Baseline water well testing requirements in Coalbed Methane development areas of Alberta
British Library Conference Proceedings | 2008
|Modeling coalbed methane performance
British Library Conference Proceedings
|Unconventional Natural Gas (6) Coalbed Methane II The Origin and Resources of Coalbed Methane
British Library Online Contents | 2015
|Research on Method of Evaluating Economically the Coalbed Methane Project
British Library Online Contents | 2001
|