A platform for research: civil engineering, architecture and urbanism
Barriers to the Implementation of Building Information Modeling among Jordanian AEC Companies
Building Information Modeling (BIM) offers significant opportunities for construction management as it provides an effective method for design and documentation, supports communication and collaboration, and enhances the most important factors of a project (time, cost, and quality). The aim of this study is to investigate the barriers to BIM implementation at AEC (architecture, management, construction, and quantity survey) companies in Jordan, and to look at the similarities and differences in perceptions on the significance of these barriers between respondents from different AEC companies. To accomplish these objectives, a questionnaire survey was created to gather feedback on the 20 major barriers to BIM implementation identified through a comprehensive literature review. The top significant barriers were identified using the Relative Importance Index (RII) and Mean value; and to assess variances between respondents in the four AEC firms, a one-way analysis of variance (ANOVA) was used. From this, it was concluded that the “cost of training”, “cost of BIM software”, “insufficient BIM technical knowledge and awareness”, “lack of adequate BIM guidelines”, and “huge BIM up frontal investment” are the key barriers affecting the BIM implementation in Jordanian AEC companies. Considering this, this study provides an important step towards better understanding the implementation of BIM in Jordan.
Barriers to the Implementation of Building Information Modeling among Jordanian AEC Companies
Building Information Modeling (BIM) offers significant opportunities for construction management as it provides an effective method for design and documentation, supports communication and collaboration, and enhances the most important factors of a project (time, cost, and quality). The aim of this study is to investigate the barriers to BIM implementation at AEC (architecture, management, construction, and quantity survey) companies in Jordan, and to look at the similarities and differences in perceptions on the significance of these barriers between respondents from different AEC companies. To accomplish these objectives, a questionnaire survey was created to gather feedback on the 20 major barriers to BIM implementation identified through a comprehensive literature review. The top significant barriers were identified using the Relative Importance Index (RII) and Mean value; and to assess variances between respondents in the four AEC firms, a one-way analysis of variance (ANOVA) was used. From this, it was concluded that the “cost of training”, “cost of BIM software”, “insufficient BIM technical knowledge and awareness”, “lack of adequate BIM guidelines”, and “huge BIM up frontal investment” are the key barriers affecting the BIM implementation in Jordanian AEC companies. Considering this, this study provides an important step towards better understanding the implementation of BIM in Jordan.
Barriers to the Implementation of Building Information Modeling among Jordanian AEC Companies
Esraa Hyarat (author) / Tasneem Hyarat (author) / Mustafa Al Kuisi (author)
2022
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Crucial barriers of building information modelling (BIM) in the Jordanian construction industry
BASE | 2020
|Building Information Modeling (BIM) Implementation Strategy in Construction Service Companies
BASE | 2023
|Investigating Barriers to Low-Carbon Policy Implementation among Mining Companies in Ghana
DOAJ | 2024
|Study on barriers of implementation of building information modeling in facilities management
BASE | 2013
|