A platform for research: civil engineering, architecture and urbanism
Optimizing the Grouting Design for Groundwater Inrush Control in Completely Weathered Granite Tunnel: An Experimental and Field Investigation
Groundwater and mud inrush disaster from completely weathered granite presents a huge difficulty for tunnel construction, which requires the grouting measurement with favorable performance. To propose the optimal material parameters for grouting, numerous tests, including strength, permeability, and anti-washout, were conducted to evaluate the effects of grouting filling ratio (GFR), curing age and water velocity on the grouting effect. The test results show that: (1) The hydraulic property of completely weathered granite can be significantly improved by increasing the grouting volume and curing age. In particular, when GFR ≥ 48%, the cohesion and internal friction angle increased to about 200 kPa and 30°, which were more than three and ten times of that pre-grouting. (2) With the increase of GFR, the permeability exhibited three stages: Slowly decreasing stage, sharply decreasing stage and stable stage. When increased from 32% to 48%, the permeability coefficient sharply decreased two orders of magnitude, namely from 4.05 × 10−5 cm/s to 1 × 10−7 cm/s. (3) The particle erosion rate decreased sharply to below 10% in the low water velocity (v ≤ 0.2 m/s) when GFR ≥ 48%, but still exceeded 50% when v ≥ 0.4m/s. The results indicated that the grouting volume of GFR = 48% was a suitable grouting parameter to reinforce the completely weathered granite, particularly in the low water velocity condition. The field investigation of hydraulic-mechanical behaviors in the Junchang tunnel indicated that the grouting effect can be improved markedly.
Optimizing the Grouting Design for Groundwater Inrush Control in Completely Weathered Granite Tunnel: An Experimental and Field Investigation
Groundwater and mud inrush disaster from completely weathered granite presents a huge difficulty for tunnel construction, which requires the grouting measurement with favorable performance. To propose the optimal material parameters for grouting, numerous tests, including strength, permeability, and anti-washout, were conducted to evaluate the effects of grouting filling ratio (GFR), curing age and water velocity on the grouting effect. The test results show that: (1) The hydraulic property of completely weathered granite can be significantly improved by increasing the grouting volume and curing age. In particular, when GFR ≥ 48%, the cohesion and internal friction angle increased to about 200 kPa and 30°, which were more than three and ten times of that pre-grouting. (2) With the increase of GFR, the permeability exhibited three stages: Slowly decreasing stage, sharply decreasing stage and stable stage. When increased from 32% to 48%, the permeability coefficient sharply decreased two orders of magnitude, namely from 4.05 × 10−5 cm/s to 1 × 10−7 cm/s. (3) The particle erosion rate decreased sharply to below 10% in the low water velocity (v ≤ 0.2 m/s) when GFR ≥ 48%, but still exceeded 50% when v ≥ 0.4m/s. The results indicated that the grouting volume of GFR = 48% was a suitable grouting parameter to reinforce the completely weathered granite, particularly in the low water velocity condition. The field investigation of hydraulic-mechanical behaviors in the Junchang tunnel indicated that the grouting effect can be improved markedly.
Optimizing the Grouting Design for Groundwater Inrush Control in Completely Weathered Granite Tunnel: An Experimental and Field Investigation
Weihua Zheng (author) / Dengwu Wang (author) / Guijin Li (author) / Lin Qin (author) / Kai Luo (author) / Jinquan Liu (author)
2019
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Groundwater control and curtain grouting for tunnel construction in completely weathered granite
Springer Verlag | 2018
|Groundwater control and curtain grouting for tunnel construction in completely weathered granite
Online Contents | 2017
|Groundwater control and curtain grouting for tunnel construction in completely weathered granite
Online Contents | 2017
|Grouting Treatment of Water and Mud Inrush in Fully Weathered Granite Tunnel: A Case Study
DOAJ | 2020
|