A platform for research: civil engineering, architecture and urbanism
High Concentration Organic Wastewater with High Phosphorus Treatment by Facultative MBR
Phosphorus is one of the main factors causing water eutrophication, and the traditional phosphorus removal process causes phosphorus-rich sludge pollution. The facultative MBR process uses phosphate-reducing bacteria to convert phosphate into directly recyclable gaseous phosphine to solve this malpractice and make sewage become a new phosphorus resource. In order to investigate the phosphorus removal efficiency and the mechanism under facultative conditions, run the facultative MBR reactor for 30 days. The COD value, phosphate concentration, and phosphine yield were measured, and the changes of sludge metabolic pathway abundance and community composition in different periods were detected. According to the measurement, the maximum phosphorus removal efficiency is 43.11% and the maximum yield of phosphine is 320 μg/m3 (measured by the volume of sewage). Combined with thermodynamic analysis, the microbial mechanism of the reactor was proposed, and the possible transformation pathway of phosphorus was analyzed. At last, changes the phosphorus removal process from the ‘removal type’ to the ‘recycling type’.
High Concentration Organic Wastewater with High Phosphorus Treatment by Facultative MBR
Phosphorus is one of the main factors causing water eutrophication, and the traditional phosphorus removal process causes phosphorus-rich sludge pollution. The facultative MBR process uses phosphate-reducing bacteria to convert phosphate into directly recyclable gaseous phosphine to solve this malpractice and make sewage become a new phosphorus resource. In order to investigate the phosphorus removal efficiency and the mechanism under facultative conditions, run the facultative MBR reactor for 30 days. The COD value, phosphate concentration, and phosphine yield were measured, and the changes of sludge metabolic pathway abundance and community composition in different periods were detected. According to the measurement, the maximum phosphorus removal efficiency is 43.11% and the maximum yield of phosphine is 320 μg/m3 (measured by the volume of sewage). Combined with thermodynamic analysis, the microbial mechanism of the reactor was proposed, and the possible transformation pathway of phosphorus was analyzed. At last, changes the phosphorus removal process from the ‘removal type’ to the ‘recycling type’.
High Concentration Organic Wastewater with High Phosphorus Treatment by Facultative MBR
Bing Wang (author) / Yunlong Liu (author) / Siyu Zhang (author) / Kaihang Zhang (author) / Pedro Alvarez (author) / John C. Crittenden (author) / Bing Sun (author) / Lin Yang (author) / Su Liu (author) / Zhilin Ran (author)
2021
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Treatment of high-concentration phosphorus wastewater based on foamed concrete
Taylor & Francis Verlag | 2022
|American Chemical Society | 2024
|TREATMENT METHOD OF WASTEWATER CONTAINING HIGH-CONCENTRATION BORON
European Patent Office | 2022
|Simplified empirical model for phosphorous removal in a facultative wastewater lagoon
Online Contents | 2017
|