A platform for research: civil engineering, architecture and urbanism
Participatory Approach for Integrated Basin Planning with Focus on Disaster Risk Reduction: The Case of the Limpopo River
This paper defends the idea that a participatory approach is a suitable method for basin planning integrating both water and land aspects. Assertions made are based on scientific literature review and corroborated by field experience and research carried out in the Limpopo River basin, a transboundary river located in southern Africa which is affected by periodical floods. The paper explains how a basin strategic plan can be drafted and disaster risk reduction strategies derived by combining different types of activities using a bottom-up approach, despite an institutional context which operates through traditional top-down mechanisms. In particular, the “Living with Floods” experience in the lower Limpopo River, in Mozambique, is described as a concrete example of a disaster adaptation measure resulting from a participatory planning exercise. In conclusion, the adopted method and obtained results are discussed and recommendations are formulated for potential replication in similar contexts of the developing world.
Participatory Approach for Integrated Basin Planning with Focus on Disaster Risk Reduction: The Case of the Limpopo River
This paper defends the idea that a participatory approach is a suitable method for basin planning integrating both water and land aspects. Assertions made are based on scientific literature review and corroborated by field experience and research carried out in the Limpopo River basin, a transboundary river located in southern Africa which is affected by periodical floods. The paper explains how a basin strategic plan can be drafted and disaster risk reduction strategies derived by combining different types of activities using a bottom-up approach, despite an institutional context which operates through traditional top-down mechanisms. In particular, the “Living with Floods” experience in the lower Limpopo River, in Mozambique, is described as a concrete example of a disaster adaptation measure resulting from a participatory planning exercise. In conclusion, the adopted method and obtained results are discussed and recommendations are formulated for potential replication in similar contexts of the developing world.
Participatory Approach for Integrated Basin Planning with Focus on Disaster Risk Reduction: The Case of the Limpopo River
Morgan De Dapper (author) / Antonio Yachan (author) / Chris M.Mannaerts (author) / Mathias Spaliviero (author)
2011
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Beyond dams: Assessing integrated water storage in the Shashe catchment, Limpopo River Basin
DOAJ | 2024
|Mozambique, Limpopo River floods
British Library Online Contents | 2002
Beyond dams: Assessing integrated water storage in the Shashe catchment, Limpopo River Basin
Elsevier | 2024
|