A platform for research: civil engineering, architecture and urbanism
Modified Transboundary Water Interaction Nexus (TWINS): Xayaburi Dam Case Study
The Mekong River comprises six riparian states and supports the livelihood of more than 65 million people. Although the rapid joint river development enlarges the pie of benefits, it also deepens existing conflict of interests and motivating downstream countries to use more power to get better control over shared waters. The purpose of the article is to operationalize a new Transboundary Water Interaction Nexus (TWINS) and interpret interchange of cooperation and conflict between Laos, Thailand, Cambodia, and Vietnam about the Xayaburi hydropower dam in the last 19 years (2000−2019). Our results show that (1) there is significant disparity between the official and public attitude towards the Xayaburi dam, (2) since 2013, the debates about the Xayaburi dam issue has been substituted by other mainstream hydropower dams, (3) the Xayaburi dam indicates that hydropower dams are one of the national priorities that will be pursued at all cost, (4) Laos gained confidence and significant political leverage on downstream countries since the groundbreaking ceremony of the Xayaburi dam in November 2012, (5) failure of the Mekong River Commission's Procedure of Notification and Prior Consultations (PNPCA) with the Xayauri dam motivated downstream countries to redesign the institutional arrangements and stakeholder consultations.
Modified Transboundary Water Interaction Nexus (TWINS): Xayaburi Dam Case Study
The Mekong River comprises six riparian states and supports the livelihood of more than 65 million people. Although the rapid joint river development enlarges the pie of benefits, it also deepens existing conflict of interests and motivating downstream countries to use more power to get better control over shared waters. The purpose of the article is to operationalize a new Transboundary Water Interaction Nexus (TWINS) and interpret interchange of cooperation and conflict between Laos, Thailand, Cambodia, and Vietnam about the Xayaburi hydropower dam in the last 19 years (2000−2019). Our results show that (1) there is significant disparity between the official and public attitude towards the Xayaburi dam, (2) since 2013, the debates about the Xayaburi dam issue has been substituted by other mainstream hydropower dams, (3) the Xayaburi dam indicates that hydropower dams are one of the national priorities that will be pursued at all cost, (4) Laos gained confidence and significant political leverage on downstream countries since the groundbreaking ceremony of the Xayaburi dam in November 2012, (5) failure of the Mekong River Commission's Procedure of Notification and Prior Consultations (PNPCA) with the Xayauri dam motivated downstream countries to redesign the institutional arrangements and stakeholder consultations.
Modified Transboundary Water Interaction Nexus (TWINS): Xayaburi Dam Case Study
Richard Grünwald (author) / Wenling Wang (author) / Yan Feng (author)
2020
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Taylor & Francis Verlag | 2020
|Water-energy-food nexus in a transboundary context: the Euphrates-Tigris river basin as a case study
Online Contents | 2015
|Water–energy–food nexus in a transboundary context: the Euphrates–Tigris river basin as a case study
Taylor & Francis Verlag | 2015
|