A platform for research: civil engineering, architecture and urbanism
Evaluation of extreme load performance of pre-Northridge connections
Disastrous consequences of a partial collapse of the Ronan Point apartment in 1968, along with the 1994 Northridge earthquake, exposed the vulnerability of steel moment frames subjected to extreme loading. The reports of these two catastrophic events revealed the significant role of the beam-to-column connection where the damage was mainly formed. A numerical and experimental investigation was conducted in accordance with 2010 AISC Seismic Provisions and UFC 4-023-03 Guideline. An inadequate cyclic behaviour and rotational capacity resulted from the analysis where the fracture in the vicinity of groove welding was due to a poorly designed connection.
Evaluation of extreme load performance of pre-Northridge connections
Disastrous consequences of a partial collapse of the Ronan Point apartment in 1968, along with the 1994 Northridge earthquake, exposed the vulnerability of steel moment frames subjected to extreme loading. The reports of these two catastrophic events revealed the significant role of the beam-to-column connection where the damage was mainly formed. A numerical and experimental investigation was conducted in accordance with 2010 AISC Seismic Provisions and UFC 4-023-03 Guideline. An inadequate cyclic behaviour and rotational capacity resulted from the analysis where the fracture in the vicinity of groove welding was due to a poorly designed connection.
Evaluation of extreme load performance of pre-Northridge connections
Iman Faridmehr (author) / Mohd Hanim Osman (author) / Mamood Md. Tahir (author) / Ali Farokhi Nejad (author) / Reza Hodjati (author)
2014
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
NORTHRIDGE POSTSCRIPT: LESSONS ON STEEL CONNECTIONS
Online Contents | 1995
|Seismic Performance Evaluation of Pre-Northridge Steel Frame Buildings with Brittle Connections
British Library Online Contents | 2002
|Seismic Performance Evaluation of Pre-Northridge Steel Frame Buildings with Brittle Connections
Online Contents | 2002
|Retrofit of Pre-Northridge Moment-Resisting Connections
British Library Online Contents | 2000
|Cyclic behaviour of post-Northridge WUF-B connections
Elsevier | 2006
|