A platform for research: civil engineering, architecture and urbanism
Evaluating Waste Material Among Construction Project: Identify Reason Waste and Suggestion Improvement Designer, Contractor and Client Practice
Objectives : This research evaluate the level of construction waste materials in Iraq construction industry and compare construction material waste among three types of executing projects including specialist contractors, general building contractor and government department. Methods : The target materials in this study were brick, cement, sand, steel, gravel and thermo-stone. SPSS V24. Descriptive and inferential analyses were applied in this study. Results and Discussion : Field observation show that the highest percentage of waste was “Brick” with 15.21% followed by “Sand” with 12.52% and “Thermo-stone” with 12.02%. The lowest percentage of waste in Iraq construction project was “Steel” and “Cement” with 3.96% and 4% respectively. The results of a comparison between these three groups confirmed that for all types of construction project waste, the governmental project had the highest percentage (12.77%), special contractor (11.19%), a general building contractor (9.71%). The major waste from materials was handling with 31.9%, concrete construction with 28.09% and 24.26% the finishing. Conclusion : The percentage of losses in the construction sites is very high compared to the permissible limit implementing inexpensive preventive measures, mostly related to managerial practice improvements.
Evaluating Waste Material Among Construction Project: Identify Reason Waste and Suggestion Improvement Designer, Contractor and Client Practice
Objectives : This research evaluate the level of construction waste materials in Iraq construction industry and compare construction material waste among three types of executing projects including specialist contractors, general building contractor and government department. Methods : The target materials in this study were brick, cement, sand, steel, gravel and thermo-stone. SPSS V24. Descriptive and inferential analyses were applied in this study. Results and Discussion : Field observation show that the highest percentage of waste was “Brick” with 15.21% followed by “Sand” with 12.52% and “Thermo-stone” with 12.02%. The lowest percentage of waste in Iraq construction project was “Steel” and “Cement” with 3.96% and 4% respectively. The results of a comparison between these three groups confirmed that for all types of construction project waste, the governmental project had the highest percentage (12.77%), special contractor (11.19%), a general building contractor (9.71%). The major waste from materials was handling with 31.9%, concrete construction with 28.09% and 24.26% the finishing. Conclusion : The percentage of losses in the construction sites is very high compared to the permissible limit implementing inexpensive preventive measures, mostly related to managerial practice improvements.
Evaluating Waste Material Among Construction Project: Identify Reason Waste and Suggestion Improvement Designer, Contractor and Client Practice
Ali Hussain (author)
2021
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Site waste management plans, the designer and the CDM principal contractor
British Library Conference Proceedings | 2010
|Contractor (pavement designer) perspective
British Library Conference Proceedings | 2002
|