A platform for research: civil engineering, architecture and urbanism
PROCESS MODELLING OF ROCK SAMPLE HANDLING IN PETROPHYSICAL LABORATORY
Everyday procedures carried out in petrophysical laboratory can be defined as a complete cycle of business processes. Sample handling process is one of the most significant and demanding procedures. It starts with sample receiving in laboratory and then subsequently, series of analyses and measurements are carrying out resulting in petrophysical parameters. Sample handling process ends with sample storage and archiving of obtained measurement data. Process model is used for description of repeating activities. Sample handling process is presented by graphical method and use of eEPC diagram (extended Event-Driven Process Chain) which describe process based on events. Created process model jointly binds static laboratory resources (measuring instruments, computers and data), speeds up process with increasing the user’s efficiency and with improvements of data and information exchange. Besides flow of activity, model of data sample handling includes information about system components (laboratory equipment and software applications) that carry out activities. Described model, with minor modifications and adaptations, can be used in any laboratory that is dealing with samples (the paper is published in Croatian).
PROCESS MODELLING OF ROCK SAMPLE HANDLING IN PETROPHYSICAL LABORATORY
Everyday procedures carried out in petrophysical laboratory can be defined as a complete cycle of business processes. Sample handling process is one of the most significant and demanding procedures. It starts with sample receiving in laboratory and then subsequently, series of analyses and measurements are carrying out resulting in petrophysical parameters. Sample handling process ends with sample storage and archiving of obtained measurement data. Process model is used for description of repeating activities. Sample handling process is presented by graphical method and use of eEPC diagram (extended Event-Driven Process Chain) which describe process based on events. Created process model jointly binds static laboratory resources (measuring instruments, computers and data), speeds up process with increasing the user’s efficiency and with improvements of data and information exchange. Besides flow of activity, model of data sample handling includes information about system components (laboratory equipment and software applications) that carry out activities. Described model, with minor modifications and adaptations, can be used in any laboratory that is dealing with samples (the paper is published in Croatian).
PROCESS MODELLING OF ROCK SAMPLE HANDLING IN PETROPHYSICAL LABORATORY
Adaleta Perković (author) / Dario Perković (author)
2010
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Classifying rock lithofacies using petrophysical data
Online Contents | 2010
|Classifying rock lithofacies using petrophysical data
IOP Institute of Physics | 2010
|Study on Petrophysical Parameters Testing Technology for Loose Rock
Tema Archive | 2012
|A classification model for rock typing using dielectric permittivity and petrophysical data
IOP Institute of Physics | 2009
|