A platform for research: civil engineering, architecture and urbanism
Redistribution of internal forces in composite concrete girders made continuous vs. time
Research on the long-term behavior of composite concrete girders made continuous is presented in the paper. Concrete precast element is cracked under construction load. Creep and differential shrinkage of precast and in-situ cast part of the girder also induce stresses in a structure. The subject of this investigation is redistribution of section forces in course of time for concrete girders subjected to change of the structural system. The aim of investigation is to verify design models and analytical procedures by experimental research.
Redistribution of internal forces in composite concrete girders made continuous vs. time
Research on the long-term behavior of composite concrete girders made continuous is presented in the paper. Concrete precast element is cracked under construction load. Creep and differential shrinkage of precast and in-situ cast part of the girder also induce stresses in a structure. The subject of this investigation is redistribution of section forces in course of time for concrete girders subjected to change of the structural system. The aim of investigation is to verify design models and analytical procedures by experimental research.
Redistribution of internal forces in composite concrete girders made continuous vs. time
Mašović Snežana (author) / Stošić Saša (author) / Pecić Nenad (author)
2011
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Long-term behavior of composite concrete girders made continuous
British Library Conference Proceedings | 2010
|Engineering Index Backfile | 1950
|Expansion of continuous concrete girders
Engineering Index Backfile | 1935
|Fire Performance of Continuous Steel-Concrete Composite Bridge Girders
Springer Verlag | 2021
|