A platform for research: civil engineering, architecture and urbanism
Determining the Layout Parameters of the Gas Drainage Roadway: A Study for Sima Coalmine China
To determine the layout parameters of the gas drainage roadway (GDR) serving for the working face, an analytical calculation method of fracture zone and the modelling experiment were adopted, and the overburden fissure induced by mining and the height of fracture zone were analyzed. For the research on the distribution of fracture zone by analytical calculation method, the multiple factors influencing the failure mode of strata and the height of fracture zone were considered. The #1207 working face in Sima mine was taken as an engineering background, and the layout parameters of GDR were given by analyzing the height of fracture zone. Combining the results obtained by analytical calculation and scale modelling experiment, the suggested height of GDR was 10.7–32.8 m away from the coal seam roof, and the projection distance of GDR in the horizontal was within the range of 0–35 m from the airway. By monitoring the gas drainage effects in different heights away from coal seam roof in #1207 working face and in different horizontal distances away from the ventilation roadway in the #1211 working face, the results showed that the optimal height was 17.5–22 m away from coal roof, and the optimal horizontal distance was 17–21 m away from airway for GDR. The gas drainage effect of GDR indicated that the proposed parameters are scientific and reasonable.
Determining the Layout Parameters of the Gas Drainage Roadway: A Study for Sima Coalmine China
To determine the layout parameters of the gas drainage roadway (GDR) serving for the working face, an analytical calculation method of fracture zone and the modelling experiment were adopted, and the overburden fissure induced by mining and the height of fracture zone were analyzed. For the research on the distribution of fracture zone by analytical calculation method, the multiple factors influencing the failure mode of strata and the height of fracture zone were considered. The #1207 working face in Sima mine was taken as an engineering background, and the layout parameters of GDR were given by analyzing the height of fracture zone. Combining the results obtained by analytical calculation and scale modelling experiment, the suggested height of GDR was 10.7–32.8 m away from the coal seam roof, and the projection distance of GDR in the horizontal was within the range of 0–35 m from the airway. By monitoring the gas drainage effects in different heights away from coal seam roof in #1207 working face and in different horizontal distances away from the ventilation roadway in the #1211 working face, the results showed that the optimal height was 17.5–22 m away from coal roof, and the optimal horizontal distance was 17–21 m away from airway for GDR. The gas drainage effect of GDR indicated that the proposed parameters are scientific and reasonable.
Determining the Layout Parameters of the Gas Drainage Roadway: A Study for Sima Coalmine China
Zhiliu Wang (author) / Bo Liu (author) / Yanhui Han (author) / Zhaoyang Li (author) / Yingjie Cao (author) / Fuzhou Qi (author)
2021
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Simulation on THM Coupling Process of Deep Rock Roadway with Aquifer in Coalmine
British Library Conference Proceedings | 2013
|Simulation on THM Coupling Process of Deep Rock Roadway with Aquifer in Coalmine
Trans Tech Publications | 2013
|Numerical Analysis on Drainage Parameters in a High Drainage Roadway
Trans Tech Publications | 2015
|Numerical Analysis on Drainage Parameters in a High Drainage Roadway
British Library Conference Proceedings | 2015
|