A platform for research: civil engineering, architecture and urbanism
A Lean Scheduling Framework for Underground Mines Based on Short Interval Control
Production scheduling management is crucial for optimizing mine productivity. With the trend towards intelligent mines, a lean scheduling management mode is required to align with intelligent conditions. This paper proposes a lean scheduling framework, based on short interval control as an effective tool to adapt intelligent scheduling in underground mines. The framework shortens the production monitoring and adjustment cycle to near-real-time, enabling timely corrective measures to minimize schedule deviations and improve overall production efficiency. An intelligent scheduling platform is implemented by adopting the digital twin platform framework, the intelligent scheduling mobile terminal module, and the integrated scheduling control cockpit module. The results indicate that the platform is effective in promoting mine intelligence by providing benefits in information transparency, flexible scheduling, lean production, and scientific decision-making. The proposed framework provides a practical solution for implementing intelligent scheduling in underground mines, contributing to the overall improvement of mine productivity. Overall, this paper provides insights for implementing intelligent scheduling in underground mines.
A Lean Scheduling Framework for Underground Mines Based on Short Interval Control
Production scheduling management is crucial for optimizing mine productivity. With the trend towards intelligent mines, a lean scheduling management mode is required to align with intelligent conditions. This paper proposes a lean scheduling framework, based on short interval control as an effective tool to adapt intelligent scheduling in underground mines. The framework shortens the production monitoring and adjustment cycle to near-real-time, enabling timely corrective measures to minimize schedule deviations and improve overall production efficiency. An intelligent scheduling platform is implemented by adopting the digital twin platform framework, the intelligent scheduling mobile terminal module, and the integrated scheduling control cockpit module. The results indicate that the platform is effective in promoting mine intelligence by providing benefits in information transparency, flexible scheduling, lean production, and scientific decision-making. The proposed framework provides a practical solution for implementing intelligent scheduling in underground mines, contributing to the overall improvement of mine productivity. Overall, this paper provides insights for implementing intelligent scheduling in underground mines.
A Lean Scheduling Framework for Underground Mines Based on Short Interval Control
Hao Wang (author) / Xiaoxia Zhang (author) / Hui Yuan (author) / Zhiguang Wu (author) / Ming Zhou (author)
2023
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Production planning and scheduling for underground mines
British Library Conference Proceedings | 1998
|National Underground Mines Inventory
NTIS | 1983
|A simulation–optimization framework for short-term underground mine production scheduling
Springer Verlag | 2020
|Underground latrines for mines
Engineering Index Backfile | 1916
|Roof Control Strategies for Underground Coal Mines
NTIS | 1993
|