A platform for research: civil engineering, architecture and urbanism
PERENCANAAN PONDASI BORE PILE PADA PROYEK JEMBATAN NGUJANG II KAB.TULUNGAGUNG
The method used in analyzing the foundation of this research is the Mayerhof method and the RSNI-T-02-2015 based approach to standard loading for bridges, thus obtaining a total vertical load of 770,121 tons, using a bore foundation 80 cm in diameter with the mayerhof method number of poles 15 with a distance of 2 meters, so the bearing capacity of the foundation pile group: Qug 852,1889 tons> from the load carried (Pu) 770,121 tons (okay), one-way control conditions φVc shear force, 6754,405> Vu, shear strength concrete, 369,490 (okay), two-way control conditions, cVc shear force, 9885.9 tons> Vc concrete shear strength 5088,825 tons (okay), reinforcement bore pile foundation. Vc. Shear force 48,593 <Φ * Vc concrete shear resistance 60,625 (okay) the number of staple reinforcement needed 21 d19 and stirrup reinforcement d13, according to the calculation, 15 bore piles are able to withstand the burdens of the upper bridge structure.
PERENCANAAN PONDASI BORE PILE PADA PROYEK JEMBATAN NGUJANG II KAB.TULUNGAGUNG
The method used in analyzing the foundation of this research is the Mayerhof method and the RSNI-T-02-2015 based approach to standard loading for bridges, thus obtaining a total vertical load of 770,121 tons, using a bore foundation 80 cm in diameter with the mayerhof method number of poles 15 with a distance of 2 meters, so the bearing capacity of the foundation pile group: Qug 852,1889 tons> from the load carried (Pu) 770,121 tons (okay), one-way control conditions φVc shear force, 6754,405> Vu, shear strength concrete, 369,490 (okay), two-way control conditions, cVc shear force, 9885.9 tons> Vc concrete shear strength 5088,825 tons (okay), reinforcement bore pile foundation. Vc. Shear force 48,593 <Φ * Vc concrete shear resistance 60,625 (okay) the number of staple reinforcement needed 21 d19 and stirrup reinforcement d13, according to the calculation, 15 bore piles are able to withstand the burdens of the upper bridge structure.
PERENCANAAN PONDASI BORE PILE PADA PROYEK JEMBATAN NGUJANG II KAB.TULUNGAGUNG
Heri Wahyudiono (author) / Sulik Anam (author)
2018
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Perencanaan Pondasi Borepile Pada Jembatan, Studi Kasus : Jembatan Utama Cisadane
BASE | 2023
|