A platform for research: civil engineering, architecture and urbanism
Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils
A reasonable maintenance time is vital in the metro shield tunnel maintenance to keep good structural performance and reduce maintenance cost. Lacking predictability, the existing maintenance mode cannot effectively resolve the contradiction between the limited maintenance cost and the growing maintenance need in the future. In this study, the degradation model of metro shield tunnels in soft soils was studied to predict the long-term serviceability. Based on that, a method was proposed to decide the optimal time of preventive maintenance for metro shield tunnels. It was found that the tunnel decay process can be expressed by the inverse exponential function-based prediction model. The cost-benefit analysis method was adopted to determine the optimal preventive maintenance time, considering the maintenance time, the maintenance cost and the maintenance measures adopted. The flow chart of this method and an application example were presented. Results can help metro operation owners to develop more scientific and reasonable preventive maintenance plans for shield tunnels in soft soils.
Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils
A reasonable maintenance time is vital in the metro shield tunnel maintenance to keep good structural performance and reduce maintenance cost. Lacking predictability, the existing maintenance mode cannot effectively resolve the contradiction between the limited maintenance cost and the growing maintenance need in the future. In this study, the degradation model of metro shield tunnels in soft soils was studied to predict the long-term serviceability. Based on that, a method was proposed to decide the optimal time of preventive maintenance for metro shield tunnels. It was found that the tunnel decay process can be expressed by the inverse exponential function-based prediction model. The cost-benefit analysis method was adopted to determine the optimal preventive maintenance time, considering the maintenance time, the maintenance cost and the maintenance measures adopted. The flow chart of this method and an application example were presented. Results can help metro operation owners to develop more scientific and reasonable preventive maintenance plans for shield tunnels in soft soils.
Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils
Junhua Xiao (author) / Jinrong Song (author) / Dong Liang (author) / Lihua Zhai (author) / Xingzhong Nong (author)
2020
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Monitoring System for Circular Deformation in Metro Shield Tunnels in Soft Soils
DOAJ | 2020
|Maintenance strategies optimisation of metro tunnels in soft soil
Taylor & Francis Verlag | 2017
|Maintenance strategies optimisation of metro tunnels in soft soil
Online Contents | 2017
|Maintenance strategies optimisation of metro tunnels in soft soil
Online Contents | 2016
|Slurry Shield Tunnels on the Cairo Metro
British Library Conference Proceedings | 1997
|