Optimization of process organization in monolithic construction Оптимизация организации производственных процессов монолитного строительства
Nowadays in Russian Federation there is a growing demand for monolithic construction. Monolithic construction technology is developing to meet the requirements, such as reduction of construction time and improvement of the quality of the structures. Analysis of different situations that arise on construction sites shows a number of usual problems: increased construction period, increased cost, etc.Possible reason of this problem can be in using outdated approaches to the control of monolithic construction processes. Such approaches do not take into account deviations due to the abrupt changes caused by external influence of the environment. And it can lead to increase in technological expectations or increase in labor costs for eliminating these deviations. This article presents an approach, which helps to increase the efficiency of process organization in monolithic construction by means of adaptive control and operative control in real time. This approach is based on the methods of operative monitoring and processing of information about the state of the production system at any given time. In this paper organizational scheme for combining different production and control processes was developed, which is based on the following principles: Choice of criteria for comprehensive assessment of a production system, that reflect both internal state and external disturbances; Development of the methods and means of operational monitoring of the structures(includes previously selected criteria); Development of the methods of constructing situation models of the production system functioning (including modeling the hydration process of concrete and the influence of external factors on this process).Development of the methods of research and information decision support based on automated processing of information, obtained in the course of monitoring, and on the analysis of available options of controlling actions.
Проанализированы современные тенденции развития монолитного строительства и предложен комплексный подход к оптимизации строительного производства, основанный на организации адаптивного управления производственными процессами с учетом мониторинга и оперативного анализа влияния внешних воздействий на рассматриваемую производственную систему.
Optimization of process organization in monolithic construction Оптимизация организации производственных процессов монолитного строительства
Nowadays in Russian Federation there is a growing demand for monolithic construction. Monolithic construction technology is developing to meet the requirements, such as reduction of construction time and improvement of the quality of the structures. Analysis of different situations that arise on construction sites shows a number of usual problems: increased construction period, increased cost, etc.Possible reason of this problem can be in using outdated approaches to the control of monolithic construction processes. Such approaches do not take into account deviations due to the abrupt changes caused by external influence of the environment. And it can lead to increase in technological expectations or increase in labor costs for eliminating these deviations. This article presents an approach, which helps to increase the efficiency of process organization in monolithic construction by means of adaptive control and operative control in real time. This approach is based on the methods of operative monitoring and processing of information about the state of the production system at any given time. In this paper organizational scheme for combining different production and control processes was developed, which is based on the following principles: Choice of criteria for comprehensive assessment of a production system, that reflect both internal state and external disturbances; Development of the methods and means of operational monitoring of the structures(includes previously selected criteria); Development of the methods of constructing situation models of the production system functioning (including modeling the hydration process of concrete and the influence of external factors on this process).Development of the methods of research and information decision support based on automated processing of information, obtained in the course of monitoring, and on the analysis of available options of controlling actions.
Проанализированы современные тенденции развития монолитного строительства и предложен комплексный подход к оптимизации строительного производства, основанный на организации адаптивного управления производственными процессами с учетом мониторинга и оперативного анализа влияния внешних воздействий на рассматриваемую производственную систему.
Optimization of process organization in monolithic construction Оптимизация организации производственных процессов монолитного строительства
Adamtsevich Aleksey Olegovich (author) / Pustovgar Andrey Petrovich (author)
2013
Article (Journal)
Electronic Resource
Unknown
production process , monolithic construction , process organization , control , optimization , monitoring , производственный процесс , монолитное строительство , организация производства , управление процессами , оптимизация организации , мониторинг , Architecture , NA1-9428 , Construction industry , HD9715-9717.5
Metadata by DOAJ is licensed under CC BY-SA 1.0
КОМПЛЕКТНО-БЛОЧНЫЙ МЕТОД ОРГАНИЗАЦИИ СТРОИТЕЛЬСТВА НЕФТЕПРОМЫСЛОВЫХ ОБЪЕКТОВ
DOAJ | 2017
|Цифровой проект организации строительства: понятие, современные требования, программное обеспечение
DOAJ | 2024
|МОДЕЛИРОВАНИЕ ОРГАНИЗАЦИИ СТРОИТЕЛЬСТВА КОНКРЕТНОГО ОБЪЕКТА ПО ЭКОЛОГИЧЕСКИМ ПАРАМЕТРАМ
DOAJ | 2017
|Модель инжиниринговой схемы организации строительства для контрактов жизненного цикла
DOAJ | 2018
|