A platform for research: civil engineering, architecture and urbanism
DETERMINING A RESILIENT STOPE BOUNDARY FOR UNDERGROUND MASS MINING PROJECTS
Uncertainty-based stope boundary optimization is a complex part of underground mine planning, especially in mass mining projects and notably block caving. Besides, grade variation and grade uncertainty are significant sources of error in mining projects. This paper presents a procedure to determine a resilient block-cave stope boundary considering the ore grade uncertainties. The procedure applies the floating stope algorithm, the maximum upside/minimum downside, and the value at risk for design evaluation. The floating stope algorithm is customized for block caving and is used to determine the stope boundary over some simulated grade models. The idea fits into a multi-criteria decision-making problem. Finally, the most resilient stope boundary is selected by considering several criteria and the TOPSIS method. According to the results, the resilient stope boundary covers an area where the mineable reserve is 977 Mt with an average copper grade of 0.51%.
DETERMINING A RESILIENT STOPE BOUNDARY FOR UNDERGROUND MASS MINING PROJECTS
Uncertainty-based stope boundary optimization is a complex part of underground mine planning, especially in mass mining projects and notably block caving. Besides, grade variation and grade uncertainty are significant sources of error in mining projects. This paper presents a procedure to determine a resilient block-cave stope boundary considering the ore grade uncertainties. The procedure applies the floating stope algorithm, the maximum upside/minimum downside, and the value at risk for design evaluation. The floating stope algorithm is customized for block caving and is used to determine the stope boundary over some simulated grade models. The idea fits into a multi-criteria decision-making problem. Finally, the most resilient stope boundary is selected by considering several criteria and the TOPSIS method. According to the results, the resilient stope boundary covers an area where the mineable reserve is 977 Mt with an average copper grade of 0.51%.
DETERMINING A RESILIENT STOPE BOUNDARY FOR UNDERGROUND MASS MINING PROJECTS
Mohammad Shami-Qalandari (author) / Mehdi Rahmanpour (author) / S. M. Mahdi Mirabedi (author)
2022
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
DETERMINING A RESILIENT STOPE BOUNDARY FOR UNDERGROUND MASS MINING PROJECTS
DOAJ | 2022
|Damage to stope walls from underground blasting
British Library Conference Proceedings | 2000
|Using ANFIS to Predict the Thickness of Transmissive Fractured Belt above Underground Mining Stope
British Library Conference Proceedings | 2006
|Experiences on stope roof management in metal underground mine
British Library Online Contents | 2007
|Rock fragmentation results for a simulated underground leaching stope
British Library Conference Proceedings | 1994
|