The risk level evaluation of foundation pit construction has the characteristics of fuzziness and randomness. Based on the theory of cloud model, a new model of risk level of foundation pit construction is discussed to comprehensively analyze the fuzziness and randomness of foundation pit construction risk assessment. Firstly, the evaluation index system of foundation pit construction risk level is established according to the field monitoring value, and then the cloud numerical characteristics of each evaluation factor belonging to different risk levels are calculated. According to the cloud digital characteristics of each evaluation factor, the determination degree of each evaluation factor belonging to different risk levels can be obtained. Finally, the weight and determination degree of the evaluation factor can be calculated comprehensively to obtain the comprehensive certainty degree of foundation pit construction risk, so as to determine the foundation pit construction risk level. The results of practical application and comparison with other evaluation methods show that this model is effective and feasible for risk classification of foundation pit construction, and has the advantages of simple calculation process and reliable results, which also provides a reference for the analysis of other similar problems.
The risk level evaluation of foundation pit construction has the characteristics of fuzziness and randomness. Based on the theory of cloud model, a new model of risk level of foundation pit construction is discussed to comprehensively analyze the fuzziness and randomness of foundation pit construction risk assessment. Firstly, the evaluation index system of foundation pit construction risk level is established according to the field monitoring value, and then the cloud numerical characteristics of each evaluation factor belonging to different risk levels are calculated. According to the cloud digital characteristics of each evaluation factor, the determination degree of each evaluation factor belonging to different risk levels can be obtained. Finally, the weight and determination degree of the evaluation factor can be calculated comprehensively to obtain the comprehensive certainty degree of foundation pit construction risk, so as to determine the foundation pit construction risk level. The results of practical application and comparison with other evaluation methods show that this model is effective and feasible for risk classification of foundation pit construction, and has the advantages of simple calculation process and reliable results, which also provides a reference for the analysis of other similar problems.
Risk assessment of foundation pit construction using cloud model
Xun Tian (author)
2020
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Risk Assessment Based on Combined Weighting-Cloud Model of Tunnel Construction
BASE | 2021
Deep foundation pit construction safety risk assessment method and system
European Patent Office | 2020
|Bridge Construction Risk Assessment Based on Variable Weight Theory and Cloud Model
DOAJ | 2024
|