A platform for research: civil engineering, architecture and urbanism
Modelling masonry crew productivity using two artificial neural network techniques
Artificial neural networks have been effectively used in various civil engineering fields, including construction management and labour productivity. In this study, the performance of the feed forward neural network (FFNN) was compared with radial basis neural network (RBNN) in modelling the productivity of masonry crews. A variety of input factors were incorporated and analysed. Mean absolute percentage error (MAPE) and correlation coefficient (R) were used to evaluate model performance. Research results indicated that the neural computing techniques could be successfully employed in modelling crew productivity. It was also found that successful models could be developed with different combinations of input factors, and several of the models which excluded one or more input factors turned out to be better than the baseline models. Based on the MAPE values obtained for the models, the RBNN technique was found to be better than the FFNN technique, although both slightly overestimated the masons’ productivity. First published online: 22 Oct 2014
Modelling masonry crew productivity using two artificial neural network techniques
Artificial neural networks have been effectively used in various civil engineering fields, including construction management and labour productivity. In this study, the performance of the feed forward neural network (FFNN) was compared with radial basis neural network (RBNN) in modelling the productivity of masonry crews. A variety of input factors were incorporated and analysed. Mean absolute percentage error (MAPE) and correlation coefficient (R) were used to evaluate model performance. Research results indicated that the neural computing techniques could be successfully employed in modelling crew productivity. It was also found that successful models could be developed with different combinations of input factors, and several of the models which excluded one or more input factors turned out to be better than the baseline models. Based on the MAPE values obtained for the models, the RBNN technique was found to be better than the FFNN technique, although both slightly overestimated the masons’ productivity. First published online: 22 Oct 2014
Modelling masonry crew productivity using two artificial neural network techniques
Ibrahim Halil Gerek (author) / Ercan Erdis (author) / Gulgun Mistikoglu (author) / Mumtaz Usmen (author)
2015
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Productivity of Brick Masonry Crew in Developing Countries
British Library Conference Proceedings | 1993
|Modelling Masonry Construction Labour Productivity
British Library Conference Proceedings | 1993
|Neural network modelling of creep in masonry
Online Contents | 2004
|Crew Allocation System for the Masonry Industry
Online Contents | 2017
|