A platform for research: civil engineering, architecture and urbanism
Calculation of Subsidence due to Longwall Mining with Overburden Grouting and Its Application
This paper presents a prediction method of mining-induced surface subsidence due to longwall mining with overburden grouting, which has been proven an effective method to mitigate the overburden failure. This paper proposes a partial overburden grouting (POG) mining method based on surface subsidence basin inversion and innovative longwall panel layout to mitigate overburden failure and subsidence. A prediction model of surface subsidence with overburden grouting, namely, overburden grouting equivalent calculation model (OGECM), is proposed. In this study, an engineering design process and method of POG was established, the strike and dip excavation length and grouting quantity combined as critical indicators for determining the key parameter in surface basin control. In applications at the field grouting test, the surface subsidence characteristics of POG on the side of the opening line of longwall panel were investigated through surface observation station and estimated surface subsidence reduction ratio based on OGECM with grouting compared with those without. The field measurement validated the new subsidence calculation method. POG technology applied to subsidence control has effectiveness in controlling the surface subsidence to less engineering cost but expanding the applications.
Calculation of Subsidence due to Longwall Mining with Overburden Grouting and Its Application
This paper presents a prediction method of mining-induced surface subsidence due to longwall mining with overburden grouting, which has been proven an effective method to mitigate the overburden failure. This paper proposes a partial overburden grouting (POG) mining method based on surface subsidence basin inversion and innovative longwall panel layout to mitigate overburden failure and subsidence. A prediction model of surface subsidence with overburden grouting, namely, overburden grouting equivalent calculation model (OGECM), is proposed. In this study, an engineering design process and method of POG was established, the strike and dip excavation length and grouting quantity combined as critical indicators for determining the key parameter in surface basin control. In applications at the field grouting test, the surface subsidence characteristics of POG on the side of the opening line of longwall panel were investigated through surface observation station and estimated surface subsidence reduction ratio based on OGECM with grouting compared with those without. The field measurement validated the new subsidence calculation method. POG technology applied to subsidence control has effectiveness in controlling the surface subsidence to less engineering cost but expanding the applications.
Calculation of Subsidence due to Longwall Mining with Overburden Grouting and Its Application
Hewen Ma (author) / Yadong Ji (author) / Shidong Wang (author)
2022
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Overburden failure due to longwall mining
British Library Conference Proceedings | 1994
|Calculation of Residual Surface Subsidence Above Abandoned Longwall Coal Mining
DOAJ | 2020
|The Reaction of Embankment to Longwall Mining Subsidence
ASCE | 2021
|