A platform for research: civil engineering, architecture and urbanism
The Ores layout optimisation on ores store of VS inc. Koice
In our work we solved an arrangement of materials on ores of VSZ inc. Kosice. Ores are 850 metres long, on those ores are moving feeders, but those feeders make ineffective work. We made such an arrangement of material, to work feeders the smallest ineffective, that we economise costs of moving feeders.
The Ores layout optimisation on ores store of VS inc. Koice
In our work we solved an arrangement of materials on ores of VSZ inc. Kosice. Ores are 850 metres long, on those ores are moving feeders, but those feeders make ineffective work. We made such an arrangement of material, to work feeders the smallest ineffective, that we economise costs of moving feeders.
The Ores layout optimisation on ores store of VS inc. Koice
Spišák Ján (author) / Straka Martin (author)
1999
Article (Journal)
Electronic Resource
Unknown
ore , feeder , transfer , arrangement , Mining engineering. Metallurgy , TN1-997 , Geology , QE1-996.5
Metadata by DOAJ is licensed under CC BY-SA 1.0
Engineering Index Backfile | 1919
Engineering Index Backfile | 1910
|Engineering Index Backfile | 1903
|Engineering Index Backfile | 1902
|Engineering Index Backfile | 1914
|