A platform for research: civil engineering, architecture and urbanism
Analyzing the influence factors of the post-earthquake reconstruction project using fuzzy DEMATEL
The high degree of integration of the Engineering-Procurement-Construction (EPC) method can more effectively reduce waste during construction and improve the sustainability of post-disaster reconstruction. The post-earthquake reconstruction in China is increasingly using the EPC method, and it is necessary to sort out the applicability and operating mechanism of the EPC method in the context of reconstruction. This study first established a process model for the post-earthquake reconstruction EPC project, and extracted 15 influencing factors. By using the fuzzy DEMATEL method, the prominence and mutual influence relationship between factors are determined. After setting a reasonable threshold, the key factors and influence paths are revealed. The study finds that the owner’s behavior, owner’s requirement, general contractor, available resources, contract and plan, and optimization information are the factors that need to be prioritized for resource allocating and managing, and they have a clear path of influence on other factors.
Analyzing the influence factors of the post-earthquake reconstruction project using fuzzy DEMATEL
The high degree of integration of the Engineering-Procurement-Construction (EPC) method can more effectively reduce waste during construction and improve the sustainability of post-disaster reconstruction. The post-earthquake reconstruction in China is increasingly using the EPC method, and it is necessary to sort out the applicability and operating mechanism of the EPC method in the context of reconstruction. This study first established a process model for the post-earthquake reconstruction EPC project, and extracted 15 influencing factors. By using the fuzzy DEMATEL method, the prominence and mutual influence relationship between factors are determined. After setting a reasonable threshold, the key factors and influence paths are revealed. The study finds that the owner’s behavior, owner’s requirement, general contractor, available resources, contract and plan, and optimization information are the factors that need to be prioritized for resource allocating and managing, and they have a clear path of influence on other factors.
Analyzing the influence factors of the post-earthquake reconstruction project using fuzzy DEMATEL
QingPing Zhong (author) / Hui Tang (author) / Wenmei Zhou (author)
2024
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Analyzing the influence factors of the post-earthquake reconstruction project using fuzzy DEMATEL
Taylor & Francis Verlag | 2024
|Analyzing the Barriers in the Seafood Packaging Industry using Fuzzy DEMATEL
Springer Verlag | 2023
|Application of fuzzy DEMATEL method for analyzing occupational risks on construction sites
BASE | 2017
|Application of Fuzzy DEMATEL Method for Analyzing Occupational Risks on Construction Sites
DOAJ | 2017
|Optimal Placement of Pressure Sensors Using Fuzzy DEMATEL-Based Sensor Influence
DOAJ | 2020
|