A platform for research: civil engineering, architecture and urbanism
Der Uebergang der Reichsautobahn Stuttgart -- Ulm ueber das Neckartal bei Unterboihingen
Design and construction of 3-span concrete-arch bridge, 148.5 m long, carrying new German superhighway over Neckar River, between Stuttgart and Ulm, Germany; details of steel reinforcement and wooden arch centerings. (See also - n 1 Jan 3 1936 p 7-10, (discussion) n 16 Apr 10 1936 p 232)
Der Uebergang der Reichsautobahn Stuttgart -- Ulm ueber das Neckartal bei Unterboihingen
Design and construction of 3-span concrete-arch bridge, 148.5 m long, carrying new German superhighway over Neckar River, between Stuttgart and Ulm, Germany; details of steel reinforcement and wooden arch centerings. (See also - n 1 Jan 3 1936 p 7-10, (discussion) n 16 Apr 10 1936 p 232)
Der Uebergang der Reichsautobahn Stuttgart -- Ulm ueber das Neckartal bei Unterboihingen
Der Uebergang der Reichsautobahn Stuttgart -- Ulm ueber das Neckartal bei Unterboihingen
Schaechterle, K. (author)
Bautechnik ; 14
1936
5 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Ueberfuehrung der Reichsautobahn ueber den Vorbahnhof Lehrte
Engineering Index Backfile | 1936
|Reichsautobahn-Straßenmeistereien
UB Braunschweig | 1942
|Reichsautobahn-Straßenmeistereien
TIBKAT | 1942
|DataCite | 1933
|UB Braunschweig | 1942
|