A platform for research: civil engineering, architecture and urbanism
Modern American railway construction methods
Construction of Southern Pacific main line diversion round Shasta dam reservoir involved special measures to insure stable formation and reduce initial maintenance; unusually careful measures were also taken to provide against earthquake damage.
Modern American railway construction methods
Construction of Southern Pacific main line diversion round Shasta dam reservoir involved special measures to insure stable formation and reduce initial maintenance; unusually careful measures were also taken to provide against earthquake damage.
Modern American railway construction methods
Ry Gaz
1942
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Modern methods in railway tunnel construction
Engineering Index Backfile | 1915
|South American railway construction
Engineering Index Backfile | 1914
|Modern railway motor design and methods of construction
Engineering Index Backfile | 1916
Modern management models for railway construction project
IuD Bahn | 2006
|Modern Methods of railway operation
TIBKAT | 1968
|