In 100 days contractor grades, drains and paves $3,900,000 airport
Details of construction of 825-acre airport for Willow Run bomber plant at Ypsilanti, Mich; involving 550,000 cu yd of earthmoving, installation of 72 mi of pipe for drainage system and laying of 153 acres of concrete paving. (p 43-5, 110, 112, 114, 116 and 118)
In 100 days contractor grades, drains and paves $3,900,000 airport
Details of construction of 825-acre airport for Willow Run bomber plant at Ypsilanti, Mich; involving 550,000 cu yd of earthmoving, installation of 72 mi of pipe for drainage system and laying of 153 acres of concrete paving. (p 43-5, 110, 112, 114, 116 and 118)
In 100 days contractor grades, drains and paves $3,900,000 airport
Construction Methods
1942
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Three-contractor team paves Detroit-wayne major airport
Engineering Index Backfile | 1949
Access to current information paves road to profitability for Missouri contractor
British Library Online Contents | 1997
PRA paves Panama Airport at acre-A-day clip
Engineering Index Backfile | 1947
PRA paves Panama Airport at acre-A-day clip
Engineering Index Backfile | 1947
Contractor paves 21 miles in 4 2/3 months by keeping the trains moving
Engineering Index Backfile | 1930