A platform for research: civil engineering, architecture and urbanism
Army camp paving at Fort Ord includes light- and heavy-duty bituminous types
Methods and equipment used in placing more than 400,000 sq yd of asphalt penetration macadam, 3-in. thick, in main streets and truck parking areas at Fort Ord.
Army camp paving at Fort Ord includes light- and heavy-duty bituminous types
Methods and equipment used in placing more than 400,000 sq yd of asphalt penetration macadam, 3-in. thick, in main streets and truck parking areas at Fort Ord.
Army camp paving at Fort Ord includes light- and heavy-duty bituminous types
Construction Methods
1941
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
BITUMINOUS PAVING COMPOSITION AND PROCESS FOR BITUMINOUS PAVING
European Patent Office | 2017
|Bituminous Paving Composition And Process For Bituminous Paving
European Patent Office | 2015
|Engineering Index Backfile | 1957
Engineering Index Backfile | 1959
Engineering Index Backfile | 1949