A platform for research: civil engineering, architecture and urbanism
Tunnelling records broken
Construction of 10 1/4 mi Murrumbidgee-Eucumbene tunnel designed to supply additional water to Snowy Mountain project in Australian Alps; tunnel size is 10 ft 2 in. finish horseshoe; rock is mostly interbedded slates, quartzite and siltstone; daily average advance is 83.7 ft; burn cut method was used exclusively since inception; drilling equipment and drill pattern.
Tunnelling records broken
Construction of 10 1/4 mi Murrumbidgee-Eucumbene tunnel designed to supply additional water to Snowy Mountain project in Australian Alps; tunnel size is 10 ft 2 in. finish horseshoe; rock is mostly interbedded slates, quartzite and siltstone; daily average advance is 83.7 ft; burn cut method was used exclusively since inception; drilling equipment and drill pattern.
Tunnelling records broken
Chem Eng Min Rev
1960
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Norweigian tunnelling projects set records, begin construction
Elsevier | 1990
Records broken by polymer solar cells in tandem:Energy generation materials
British Library Online Contents | 2007
|Records broken in concrete placement for piers of Mackinac bridge
Engineering Index Backfile | 1955
|Records broken in concrete placement for piers of Mackinac bridge
Engineering Index Backfile | 1955
|