A platform for research: civil engineering, architecture and urbanism
Instrumentation for consolidation study of clay deposit beneath embankment
For measurement of consolidation beneath highway embankment settlement gage was developed and installed just below natural ground surface before 23 ft high embankment was constructed; settlement between natural ground surface and reference elevations within clay deposit were measured by determining electric resistances proportional to vertical displacements; by connected potentiometer, displacements to accuracy of 0.05 in. or 1.3 mm can be determined.
Instrumentation for consolidation study of clay deposit beneath embankment
For measurement of consolidation beneath highway embankment settlement gage was developed and installed just below natural ground surface before 23 ft high embankment was constructed; settlement between natural ground surface and reference elevations within clay deposit were measured by determining electric resistances proportional to vertical displacements; by connected potentiometer, displacements to accuracy of 0.05 in. or 1.3 mm can be determined.
Instrumentation for consolidation study of clay deposit beneath embankment
Geotechnique
Burn, K.N. (author)
Geotechnique ; 9
1959
11 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Isolated consolidation settlement of very soft ground beneath a high-embankment
British Library Conference Proceedings | 1998
|Progressive consolidation of highly structured clay under embankment loading
British Library Conference Proceedings | 2005
|Performance of Reinforced Embankment on Muar Clay Deposit (errata)
Online Contents | 1994
|