A platform for research: civil engineering, architecture and urbanism
Canal system and its effect on economy of State and Nation as whole are analyzed; total mileage of Canal system is 527 mi with 151 mi of artificial land cut channels and 376 mi of canalized rivers, lakes and streams; river locks, gates and bridge type movable dams are described.
Canal system and its effect on economy of State and Nation as whole are analyzed; total mileage of Canal system is 527 mi with 151 mi of artificial land cut channels and 376 mi of canalized rivers, lakes and streams; river locks, gates and bridge type movable dams are described.
New York State barge canal system
ASCE -- Proc (J Waterways Harbors Div)
Hudowalski, E.C. (author)
1959
30 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1913
The New York state barge canal
Engineering Index Backfile | 1920
|The New York State Barge Canal
Engineering Index Backfile | 1917
|Standard concrete barge for use on the New York state barge canal
Engineering Index Backfile | 1918
Erie Overhaul: The New York State Barge Canal
ASCE | 2016
|