A platform for research: civil engineering, architecture and urbanism
Outer breakwater completed in 1957, used tetrapods as armor stone for last section; design criteria and construction problems of project which was first to use tetrapods in United States; storm of Apr 1958 approached design standards; only minor settling of tetrapods was noted.
Outer breakwater completed in 1957, used tetrapods as armor stone for last section; design criteria and construction problems of project which was first to use tetrapods in United States; storm of Apr 1958 approached design standards; only minor settling of tetrapods was noted.
Breakwater at Crescent City, California
ASCE -- Proc (J Waterways Harbors Div)
Deignan, J.E. (author)
1959
15 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Breakwater rehabilitation study, Crescent City Harbor, California : Coastal model investigation
UB Braunschweig | 1985
|Breakwater Rehabilitation Study, Crescent City Harbor, California: Coastal Model Investigation
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1985
|HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1995
|