A platform for research: civil engineering, architecture and urbanism
Bouquet Canyon reservoir and pipe line
Newest unit of Los Angeles' water-supply system is formed by two earth-and-rock-fill dams; spillway is vertical shaft of 8 ft internal diam with belled-out intake 16 ft in diam; pressure tunnel 1027 ft long is linked with 3 1/2-mi steel pressure pipe line.
Bouquet Canyon reservoir and pipe line
Newest unit of Los Angeles' water-supply system is formed by two earth-and-rock-fill dams; spillway is vertical shaft of 8 ft internal diam with belled-out intake 16 ft in diam; pressure tunnel 1027 ft long is linked with 3 1/2-mi steel pressure pipe line.
Bouquet Canyon reservoir and pipe line
Engineer
Engineer ; 160
1935
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Constructing bouquet canyon pipe line
Engineering Index Backfile | 1934
|Bouquet canyon reservoir and dams
Engineering Index Backfile | 1934
|Bouquet canyon reservoir and outlet works
Engineering Index Backfile | 1933
The Bouquet Canyon Dam and Inlet‐Outlet Pipe
Wiley | 1935
|A dynamic Investigation of Bouquet Canyon Dam
TIBKAT | 1964
|