A platform for research: civil engineering, architecture and urbanism
Completion of main trunk railroad, 680 mi long, connecting Hankow with Canton; construction of 250-mi section from Shaochow to Lochang presented difficult problems because of inaccessibility and ruggedness of country; work started at both ends; foreign materials used; costs totaling about $43,000,000.
Completion of main trunk railroad, 680 mi long, connecting Hankow with Canton; construction of 250-mi section from Shaochow to Lochang presented difficult problems because of inaccessibility and ruggedness of country; work started at both ends; foreign materials used; costs totaling about $43,000,000.
Constructing Canton-Hankow railway
Civ Eng (NY)
Ling, H.H. (author)
1935
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Constructing Canton-Hankow Railway
Engineering Index Backfile | 1935
|Engineering Index Backfile | 1911
|Reballasting the Kowloon Canton Railway Corporation (KCRC)
British Library Conference Proceedings | 1995
|The Beacon hill tunnel, Kowloon-Canton railway
Engineering Index Backfile | 1911
Benchmarking within Kowloon - Canton Railway Corporation (KCRC)
British Library Conference Proceedings | 1995
|